Similar Projects
Sanitary Sewer Expansion
Infrastructure
Conception
Perrysburg, OH 43551

Uptown Sanitary Sewer Rehabilitation Phase I Improvements
Infrastructure
Bidding
$595,000 est. value
Maumee, OH

Installation of New Valves and Fittings at the Wastewater Treatment Plant
Infrastructure
Bidding
Mingo Junction, OH 43938

Portsmouth Local Protection Project
Post-Bid
$10,000,000 est. value
Portsmouth, OH

Phase V CSO Improvements Project
Post-Bid
Less than $1,604,000 est. value
McConnelsville, OH

Waterline/ Storm Drainage/Walking Path Project
Results
Less than $504,000 est. value
Lakeview, OH

Locust Lake Lift Station and Conveyance Improvements
Results
Less than $1,760,000 est. value
Batavia, OH 45103

Wayne and Various Street Improvements
Infrastructure
Bidding
$1,800,000 est. value
Cleveland, OH

West Central Avenue Improvements Phase 1
Post-Bid
Camden, OH 45311

West Main Street Sewer
Results
Less than $361,904 est. value
Springfield, OH 45501

Wastewater BMP Cleanout
Post-Bid
Columbus, OH 43215

2020 Sanitary Sewer Lining Project
Results
Less than $375,674 est. value
Hamilton, OH 45011

Sanitary Line Replacement Project
Post-Bid
$70,000 est. value
Lisbon, OH 44432

Cured In Place Pipe Repair of Various Storm Sewers, Phase I
Results
OH

West Side Trunk Rehabilitation-Phase 2
Infrastructure
Post-Bid
Columbus, OH

Last Updated 12/23/2021 11:40 AM
Project Title

South and Center Trunk Collection System Improvements

Physical Address View project details and contacts
City, State (County) Cadiz, OH   (Harrison County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,501,580
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract #1 – South Wastewater Collection System Improvements The work shall consist of installation of approximately 2,435 LF of HDPE storm pipe ranging in size from 12” to 24”, eight (8) storm sewer manholes, 16 catch basins, 5,110 LF of 6” and 14,280 LF of 8” PVC sanitary sewer pipe, 65 LF of 6” and 1,770 LF of 8” DIP sanitary sewer pipe, 100 sanitary sewer manholes, 45 LF of 16” steel casing bore & jack, relining 500 LF of 6-inch, 8,965 LF of 8-inch and 1,425 LF of 10-inch sanitary sewer line, raising 13 existing manholes to grade, replacing 43 manhole frame and covers, 250 VF of manhole lining, surface restoration, reconnection of existing lines and all other necessary appurtenances. Contract #2 – Center Wastewater Collection System Improvements The work shall consist of installation of approximately 1,225 LF of HDPE storm pipe ranging in size from 12” to 24”, five (5) storm sewer manholes, eight (8) catch basins, 5,630 LF of 6” and 4,885 LF of 8” PVC sanitary sewer pipe, 515 LF of 6” and 1,270 LF of 8” DIP sanitary sewer pipe, 56 sanitary sewer manholes, 295 LF of 16” steel casing bore & jack, relining 430 LF of 6-inch and 9,410 LF of 8-inch sanitary sewer line, raising 12 existing manholes to grade, replacing 36 manhole frame and covers, 235 VF of manhole lining, surface restoration, reconnection of existing lines and all other necessary appurtenances. Contract #1 is $5,400,000, Contract #2 is $3,265,000.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents