Similar Projects
Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

LMIG Paving / Resurfacing 2021
Infrastructure
Post-Bid
McDonough, GA

Southern Region Disaster Recovery Support BPA
Results

Annual Contract for West Main Street Improvement - Phase 1
Results
Hampton, GA 30228

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

2020 LMIG Program
Results
Stockbridge, GA 30281

Stormwater Design for Georgia Avenue
Infrastructure
Post-Bid
Hampton, GA 30228

T32-D3-Pavepres-SR 20 SR 81 Henry-109266
Results
GA

Flippen Road Extension
Results
McDonough, GA 30253

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 3 and 4
Results
Atlanta, Dahlonega, Dunwoody, Hampton, Irondale, Jonesboro, LaFayette, Riverdale, Roswell, GA 30525

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 1 and 2
Results
Ellenwood, Forest Park, Lawrenceville, Macon, Morrow, Rex, Riverdale, Stockbridge, Union City, Warner Robins, Woodstock, GA 30294

2021 LMIG Program
Results
Stockbridge, GA 30281

Mill Road at Mount Carmel Road
Results
McDonough, GA 30252

Last Updated 01/24/2022 10:31 AM
Project Title

East King Road and Floyd Road Roundabout Intersection

Physical Address View project details and contacts
City, State (County) Hampton, GA 30228   (Henry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing and installing all materials, labor, tools, equipment, and related services required for a complete project. This project includes but is not limited to providing the construction of a complete four-leg roundabout intersection at the existing intersection of E. King Rd., W. King Rd., and Floyd Rd.; also, Grafton St., the new proposed entrance road into The Greens at Thompson Creek subdivision. The roadway project totals approximately 1,000 L.F. of roads containing 2,422 S.Y. asphalt pavement with concrete curb and gutter, approximately 388 S.Y. of concrete truck apron, and sidewalks, crosswalks, raised medians, signage and markings, storm drainage structures and piping, water main relocation, utility and electric facility relocation, roadway lighting, site grading, sodding, and erosion and sediment control

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents