Similar Projects
As Needed Plumbing Services
Term Contract
Post-Bid
Greenville, NC 27835

Bath Renovations (Solid Surface)
Post-Bid
Robersonville, NC 27871

Morreene Road Apartments Plumbing Replacement
Results
Durham, NC 27705

Touch-Free Plumbing Fixtures Conversion Project - Phase 1
Results
Morrisville, NC

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

Medical Surgical Vacuum System Upgrades
Post-Bid
Chapel Hill, NC

Bathroom Renovation in Development NC19P076002
Results
Less than $200,000 est. value
Farmville, NC 27828

State Public Health Lab Nitrogen Generator
Post-Bid
Raleigh, NC

Meadow Ridge Plumbing Replacement
Results
$149,131 est. value
Raleigh, NC 27604

Re-Piping for Kitchen
Post-Bid
Asheboro, NC 27205

Residential Plumbing Services
Alteration
Results
$4,000 est. value
Concord, NC

On-Call Plumbing Services
Post-Bid
Durham, NC

Furnish and Deliver Elkay ADA Coolers
Alteration
Results
Raleigh, NC

Underground Piping Project of Crossnore Elementary School
Post-Bid
Newland, NC 28657

Touch-Free Plumbing Fixtures Conversion Project - Final Phase
Alteration
Results
Morrisville, NC 27560

Last Updated 07/07/2022 03:32 PM
Project Title

Plumbing Installation and Repair

Physical Address View project details and contacts
City, State (County) NC   (Wake County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor must carry appropriate licenses as required by the state of North Carolina. Contractor shall have adequate and qualified staff in order to provide WCPSS with the service and/or response time requested. Contractor must be able to handle multiple calls at one time, respond on a 24 hour, 7 day basis, and will be expected to respond to emergency requests within 2 hours. Scope of work includes installation, maintenance, and repair of plumbing equipment such as toilets, sinks, water piping, roof leaders, and hot water heaters. Must be knowledgeable of piping schematics and be able to troubleshoot problems relating to these systems. Contractor will have procedures in place for working on these systems and employee training will be kept up to date as per contractors requirements. Contractor will utilize a Lockout/Tagout procedure when working on these systems. Contractor shall be responsible for any required permitting and incidental supplies or hardware in order to perform any job tasks. Any viable parts removed from plumbing equipment during assigned work shall either be reinstalled in the equipment or returned to WCPSS.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents