Similar Projects
Sidewalk Improvements
Infrastructure
Bidding
$75,000 CJ est. value
Prophetstown, IL 61277

Sidewalk Improvements
Infrastructure
Bidding
$75,000 CJ est. value
Prophetstown, IL 61277

Sidewalk Replacement And ADA Ramps
Alteration
Post-Bid
Rock Falls, IL 61071

Installation of Oversized Chevrons along Interchange Ramp Curves at Various Locations
Infrastructure
Post-Bid

HMA Pavement Resurfacing
Results
Morrison, IL 61250

2021 Village of Erie Sealcoating
Results
Erie, IL

Water System Improvements Contract - New Well No. 5 and Water Treatment Plant
New Construction, Renovation, Infrastructure - 3,590 SF
Bidding
$1,500,000 CJ est. value
Prophetstown, IL 61277

2022 Sidewalk/Curb Maintenance Program
Term Contract, Infrastructure, Alteration
Post-Bid
Sterling, IL

Removal And Replacement Of Existing Expansion Joints On SN 098-0032 Carrying US 30 Over Elkhorn Creek
Results
IL

Pavement Resurfacing
Term Contract
Post-Bid
$200,000 est. value
Morrison, IL

Milling and resurfacing on US 30 from Jackson Street to French Creek East of Morrison
Results
Prophetstown, IL 61277

Pavement Resurfacing
Infrastructure
Post-Bid
$200,000 est. value
Morrison, IL

Cold-In-Place Recycling and Resurfacing on Lyndon Road from Us 30 to Commercial Street
Results
Lyndon, IL 61261

2022 GM Route(s) Grove Hill Cemetery
Infrastructure
Post-Bid
$54,000 est. value
Morrison, IL 61270

1st Avenue Reconstruction
Renovation
Results
Less than $2,648,519 est. value
Sterling, IL 61081

Last Updated 09/12/2022 01:07 PM
Project Title

Riverfront Walkway Crossing - Riverfront Park

Physical Address View project details and contacts
City, State (County) Sterling, IL 61081   (Whiteside County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected October 2021
Bids Due View project details and contacts
Estimated Value $35,770 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Earth Excavation, Pipe Culvers, P.C.C. Sidewalk, Segmental Block Retaining Wall, Stone Riprap, Walkway Bridge, and restoration Site Directions : Riverfront Park - South of the Intersection of Wallace St. and Ave. B Est. Completion Date : Dec. 10, 2021 The project is located within the limits of the City of Sterling, Illinois (Owner) along the Rock River south of the intersection of Ave. B and Wallace Street. DESCRIPTION OF PROJECT This project consists of the construction of P.C.C. Sidewalk at two areas previously omitted along the existing sidewalk/multi-use path located along the Rock River. Construction shall include the installation of Pipe Culverts, Segmental Concrete Block Walls, and Walkway Bridge.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents