Similar Projects
Incidental Roadwork - Various Town of Canton Local Roads
Bidding
Canton, CT

Tromley Road Reconstruction
Bidding
Windsor, CT

On-Call Equipment and Labor Rates for Civil Site Work
Post-Bid
Simsbury, CT

Private Alleyway Resurfacing Project
Post-Bid
Hartford, CT 06106

Riverside Road and Drake Hill Road Pavement Rehabilitation and Bridge Repairs at Bridge No. 05637
Results
Less than $481,138 est. value
Simsbury, CT 06070

Asphalt Pavement Crack Sealing
Term Contract
Results
Hartford, CT

Crack Sealing of City Streets - 2020
Post-Bid
New Britain, CT

Safety and Operational Improvements on I-84
Results
$40,000,000 to $59,999,999 est. value
West Hartford, CT 06107

AASF Access Road Aircraft Apron Repairs - Phase 1 Bradley Army National Guard Base
Post-Bid
$800,000 to $1,000,000 est. value
Windsor Locks, CT 06078

Resurfacing, Bridge Rehabilitation and Safety Improvements
Results
$40,000,000 to $59,999,999 est. value
Meriden, Southington, CT 06450

CY2021 Paving of Roadways
Post-Bid
Windsor, CT

2020 Paving Program - Contract 1
Results
Manchester, CT

CY2021 Milling and Reclaiming of Roadways
Post-Bid
Windsor, CT

Roundabout on Route 10/202 at East Street and Notch Road
Results
$1,000,000 to $2,499,999 est. value
Granby, CT 06035

Bituminous Concrete Materials and Bridge Deck Membrane Waterproofing (Complete in Place)
Results

Last Updated 05/01/2020 07:16 AM
Project Title

Columbus Boulevard and Chestnut Street - Phase VII Downtown Complete Streets Project

Physical Address View project details and contacts
City, State (County) New Britain, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,749,898
Plans Available from Municipal Agency - 03/10/20
Owner View project details and contacts
Architect View project details and contacts
Description

Complete Street Improvements on Columbus Boulevard, between the Harry Truman (Route 71) overpass, the north side of Chestnut Street, between Elm Street (Route 71) and Columbus Boulevard and on Herald Square. The work includes installation of new granite curbing, new concrete and brick paver sidewalks and pedestrian ramps to meet current ADA standards, new concrete driveway aprons, replacement of existing catch basin tops and installation of new catch basins, milling and paving, installation of new signage and pavements markings, installation of new street trees and minor traffic signal modifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents