Similar Projects
Building Management System
Bidding

Mechanical Upgrades - Partial Roof Top Unit Replacement
Bidding
Washington, NJ 07882

Maintenance and Service Contract of Boilers and Associated Boiler Equipment Including Air Handling Units
Post-Bid
West New York, NJ 07093

Heating, Ventilation and Air Conditioning Preventative Maintenance and Repair
Post-Bid
Jersey City, NJ 07305

HVAC Maintenance - Caven Point Marine Terminal, NJ
Results
Jersey City, NJ 07030

Replacement Rooftop Air Handling Units
Results
Guttenberg, NJ 07093

Inspection, Maintenance, Testing, Repair, and Emergency Services for the American Air Filter (AAF) Roto-Clone Dust Particle Removal Systems at PATH Harrison Car Maintenance Facility (HCMF)
Term Contract
Bidding

Gas-Oil-Electric Heating Unit Ventilator and Cooling System Repair Services (HVAC) - Various Sites (As Needed)
Post-Bid
Jersey City, NJ 07305

HVAC and Boiler Maintenance
Results
Jersey City, NJ

Maintenance and Repair of HVACR Units and Systems
Post-Bid
North Bergen, NJ 07047

Gas, Oil, Electric, Heating, Unit Ventilator and Cooling System Service (HVAC)
Results
Less than $750,000 est. value
Jersey City, NJ

Control Maintenance for HVAC Andover Systems
Term Contract
Post-Bid
Harrison, NJ 07029

Boiler Maintenance, Repair and Emergency Replacement
Results

Performance of Expert Professional Air Quality Monitoring and Analysis Services
Term Contract
Post-Bid
Jersey City, NJ

HVAC Systems Inspection, Repair and Preventative Maintenance Contract
Term Contract
Results
Atlantic City, Camden, Dover, Egg Harbor Township, Fairview, Hackensack, Hamilton, Howell, Irvington, Jersey City, Lakewood, Maplewood, Newark, North Bergen, Nutley, Old Bridge, Oradell, Orange, Paterson, Ridgefield, Turnersville, Wayne, Weehawken, Wildwood, NJ

Reported 02/14/2020 12:00 AM
Project Title

Union City Municipal Building HVAC Replacement

Physical Address View project details and contacts
City, State (County) Union City, NJ 07087   (Hudson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes removal of existing Variable Air Volume (VAV) boxes and central station air handling units and associated thermostats and controls on floors two, three, and four, removal of existing rooftop makeup air unit and associated controls, and removal of four (4) gas-fired boilers and associated controls. Three (3) Variable Refrigerant Flow (VRF) systems will be provided for the building, one system serving each floor on floors two, three, and four. Three (3) outdoor heat pump towers will be located on the roof. A branch controller box will be provided on each floor. Each of the zones of the building will be provided with ducted indoor fan-coil units mounted above the ceiling. Supply air ductwork will extend from these ceiling concealed indoor units and connect to the existing supply air ducts. Return air ducts will be open-ended and utilize the space above the ceiling as a return air plenum. Condensate piping shall extend from the primary drains at each of the new indoor units and terminate with an indirect waste at a floor drain within a mechanical or utility closet. Two (2) new modular, condensing, gas-fired boilers shall be provided in place of the four boilers that were removed. Two new hot water pumps will be provided to replace two existing pumps. An electronic, direct digital control (DDC) system shall be provided to support operation monitoring, error/alarm notification, set point adjustments and overrides, scheduling, occupancy, error email distribution, etc. for all new HVAC equipment. Control system shall include head end unit with graphics of all components, parameters, and also shall offer remote access via web browser. All work on this contract must be completed within one hundred eighty (180 days per SP-16) calendar days from issuance of a Notice to Proceed. Only mechanical contractors with a minimum of five (5) previous Variable Refrigerant Flow (VRF) projects shall be considered for this project. Contractors shall include documentation of this experience as part of the bid submission. Only mechanical contractors with a minimum of five (5) previous projects installing systems with at least 50-tons total cooling capacity shall be considered for this project. Contractors shall include documentation of this experience as part of the bid submission. Only contractors with a minimum of five (5) previous projects consisting of occupied office renovations shall be considered for this project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents