Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

1413 West 13th St Rehab Project
Infrastructure
Bidding
$250,000 est. value
Davenport, IA 52804

Sewer Lateral Program FY23
Infrastructure
Bidding
$50,000 to $600,000 est. value
Davenport, IA

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

PCC Patching
Infrastructure
Post-Bid
IA

Indiana Avenue Friction Seal
Infrastructure
Results
Bettendorf, IA

23rd Street Reconstruction
Infrastructure
Results
Bettendorf, IA

PCC Pavement - Replace
Infrastructure
Bidding
$3,000,000 to $3,500,000 est. value
Davenport, IA

Pleasant View ES 2022 Access Drive Improvements
Infrastructure
Post-Bid
Bettendorf, IA 52722

Marquette and West 12th Street Replacement
Infrastructure
Results
Davenport, IA

West 69th Street and Jebens Avenue Road Projects
Infrastructure
Bidding
$200,000 est. value
Davenport, IA 52806

Middle Road Rehabilitation
Infrastructure
Results
Bettendorf, IA

Emerald Drive Reconstruction
Infrastructure
Results
Davenport, IA 52804

2021 Alley Resurfacing Program
Infrastructure
Results
Davenport, IA

Hickory Grove Road Resurfacing, North Pine Street North to end of HMA overlay
Infrastructure
Results
Davenport, IA 52805

Last Updated 05/30/2022 04:21 AM
Project Title

Forest Grove - PCC Pavement - Grade and Replace

Physical Address View project details and contacts
City, State (County) Bettendorf, IA   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,500,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In The City Of Bettendorf, Forest Grove Dr. & Middle Road. 4.00 Each Aprons 137.30 Units Clearing & Grubbing 880.00 Square Yard Drives, p.c.c. 50,519.00 Cubic Yard Embankment-In-Place 50.00 Square Yard Engineering Fabric 12,551.00 Cubic Yard Excavation Class 10 272.00 Linear Foot Fence, Field 1.00 Each Field Laboratory/Office 345.00 Ton Granular Shoulders, Type a 79.00 Each Intakes & Manholes/Utility Access 8,355.00 Cubic Yard Modified Subbase 418.00 Station Pavement Markings 36,232.00 Square Yard Pavement, p.c.c. 1,260.00 Linear Foot Posts, Metal, For Signs 7,223.00 Square Yard Recreational Trail, Pcc 29,544.00 Square Yard Removal Of Pvmnt/Drives/Sdwk 47.00 Ton Revetment 2,370.00 Linear Foot Sewer Sanitary 5,887.00 Linear Foot Sewer, Storm 225.00 Station Shoulder Finishing 1,768.00 Each Shrubs 203.00 Square Yard Sidewalk, p.c.c. 705.00 Square Foot Signs, Type a 7,013.00 Linear Foot Silt Fence 1,877.00 Square Sodding 7.81 Acre Stabilizing Crop, Seed & Fert. 18,954.00 Linear Foot Subdrain 333.00 Ton Surfacing, Crushed Stone 1,937.00 Linear Foot Temp. Barrier Rail 10,527.00 Cubic Yard Topsoil, Strip/Salvage/Spread 85.00 Each Trees

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents