Similar Projects
Lift Station 53 Improvements
Bidding
Less than $350,000 est. value
West Palm Beach, FL 33407

Lift Station No. 153
Post-Bid
Less than $400,000 est. value
West Palm Beach, FL 33411

Lift Station Rehabilitation Project - Bid Package 2
Post-Bid
FL

Abandonment of Kent Pump Station (PS-05)
Results
Less than $802,000 est. value
Palm Springs, FL

Lift Station 5, 39, 41,44,74, 85 Rehabilitation
Results
Less than $1,730,500 est. value
Wellington, FL

E-3, E-4 and G-9 Wastewater Pump Station Improvements
Results
Less than $2,000,000 est. value
Palm Beach, FL

Lift Station Rehabilitation
Results
Jupiter, FL

Lift Station Rehabilitation for Fountainview, Mediterranean and Woodlands
Results
Palm Springs, FL

Wastewater Pump Station No. 15 and 21 Improvements
Results
Lake Worth, FL

Lift Station No. 26, 45 and 51 Rehabilitation
Results
Less than $2,750,000 est. value
West Palm Beach, FL

Unit No. 53 Arden – Parcels K and E-South Public Improvement Project
Results
Palm Beach Gardens, FL

Lift Station No. 9 Improvements
Results
Less than $157,000 est. value
Palm Beach Gardens, FL

E-2 Lift Station Improvements
Results
Palm Beach, FL

E-1 Lift Station Improvements
Results
Less than $350,000 est. value
Palm Beach, FL

Lift Station 74 and 75 Improvements
Results
$1,250,000 est. value
West Palm Beach, FL

Last Updated 07/15/2019 07:44 AM
Project Title

Water Treatment Plant No. 11 High Service Pump Station Electrical Building Improvements

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33416   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Construct a new High Service Pump Station (HSP) electrical building at Water Treatment Plant No. 11 (WTP11) to replace the existing HSP electrical building complete with associated civil improvements, (ii) 24-inch suction pipeline from the ground storage tanks to the High Service Pump Station suction header, (iii) replacement of piping, fittings and appurtenances at the High Service Pump Station, and (iv) associated electrical, instrumentation and controls work to support the above referenced improvements.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents