Similar Projects
Reported | 03/24/2022 12:00 AM |
Project Title | Switchgear Installation: Naval Base, San Diego - Provide and Install 200 Amp Circuit Breaker Within Existing Switchgear |
Physical Address | View project details and contacts |
City, State (County) | San Diego, CA 92136 (San Diego County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Southwest Regional Maintenance Center (SWRMC) has a need for parts and Switchgear installation as follows: Contractor shall provide: one (1) 100amp circuit breaker to add into existing HN1B panel; one (1) 200 amp 120/208V 3 phase 42 circuit breaker panel with a main circuit breaker and sub breakers; pull and terminate wiring at connection points; provide feeders for 75KVA transformer and new panel; provide branch feeders to equipment; remove lock out/tag out on all necessary equipment; perform necessary concrete scanning to ensure there are no damages to underground utilities; and install conduit, wire troughs, and junction boxes. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |