Similar Projects
Last Updated | 04/29/2020 12:19 PM |
Project Title | Demolition and Removal of the 7 Normand Avenue Building |
Physical Address | View project details and contacts |
City, State (County) | Sanford, ME 04073 (York County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Demolition |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor agrees and undertakes to demolish and remove the structures and debris at 7 Normand Avenue in its entirety, including complete removal and breaking up the foundation, slab, and any under structure found; and additionally as part of the project as summarized: Filling the cellar hole with clean soil and any crushed foundation as may remain; 1. Applying clean soil to match the natural grade of the surroundings; 2. Applying sufficient depth of wood chips to cover the impacted area of the property provided by the City Public Works Department from the Public Works Facility, hauled by the contractor; 3. Installing split rail fencing long the street frontage, approximately 48 feet in length; 4. Mounting 1 sign on āUā channel along the frontage. Mounting of the sign to be provided by the contractor. The City shall provide the signs to the contractor. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |