Similar Projects
Controller Replacement and Associated Work on the Wellesley Hills Campus
Bidding
$75,000 est. value
Wellesley, MA

Fire Alarm and Sprinkler Maintenance
Bidding
Boston, MA

Inspection, Testing and Maintenance of the Entire Fire Alarm System-Sub-Bids
Sub-Bidding
Boston, MA

Fens Gatehouse Repurposing - Sub-Bids
Sub-Bidding
$1,155,996 est. value
Boston, MA

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Plumbing Maintenance and Service
Post-Bid
Less than $1,800,000 est. value

Pool HVAC Project
Results
$300,000 est. value
Westwood, MA 02090

Substation 495 Substation and Transmission Electrical Construction
Results
Less than $400,000 est. value
Norwood, MA 02062

Water Bottle Refill Stations
Bidding
Boston, MA

Demolition of Existing Generator, Gas Piping, and HVAC Equipment
Sub-Bidding
Less than $185,000 est. value
Bellingham, MA

Sprinkler
Post-Bid
Norfolk, MA

Bolivar Aquatic Complex - Filed Sub Bid
Results
Less than $4,800,000 est. value
Canton, MA

Maintenance, to Electrical and Mechanical Equipment
Bidding
Boston, MA

Sprinkler
Post-Bid
Norfolk, MA

Bathroom Mechanical Exhaust Fan Installation - Filed Sub-Bids
Results
Less than $215,676 est. value
Brookline, MA 02446

Last Updated 06/03/2020 12:17 PM
Project Title

Renovation and Expansion of Existing Locker Rooms at Ulin Rink - Sub-Bids

Physical Address View project details and contacts
City, State (County) Milton, MA   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Electric, Fire Protection, HVAC, Masonry, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $475,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. Goals: Veteran-Owned Business Enterprises - 3% The renovation and expansion of existing locker rooms at Ulin Rink. The project provides dedicated toilet/shower rooms for the existing locker rooms spaces. Miscellaneous work is required to reconfigure existing bleachers. Work includes selective demolition, masonry, doors, finishes, specialties, and MEP trades.

Details

Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents