Similar Projects
On-Call HVAC Services
Term Contract
Bidding
San Diego, CA

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

OR Suite HVAC Replacement In Bldg 1, Project 664-21-302
Term Contract
Results
$2,000,000 to $5,000,000 est. value
San Diego, CA 92161

HVAC Maintenance Services
Term Contract
Results
Oceanside, CA

OR Suite HVAC Replace in Building I
Alteration
Post-Bid
San Diego, CA 92161

SDIA- Airport Administration Building - HVAC
Alteration
Results
San Diego, CA 92101

Heating, Ventilation, and Air Conditioning (HVAC) Duct System Maintenance Services (Oceanside DMV Field Office)
Term Contract, Alteration
Post-Bid
$15,000 est. value
Oceanside, CA 92056

HVAC Installation at Mendoza and Nicoloff Elementary
Alteration
Results
$645,000 est. value
San Diego, CA 92154

La Cima CC HVAC Replacements
Alteration
Post-Bid
Julian, CA 92036

New Cooling Tower
Alteration
Results
$200,000 est. value
Poway, CA 92064

Mission Valley HVAC Upgrade Project
Term Contract
Post-Bid
$1,496,000 est. value
CA

HVAC Air Handler Unit (ACU) Replacement Services
Term Contract
Post-Bid
Chula Vista, CA

HVAC Maintenance IWA
Alteration
Post-Bid
CA

Preventive Maintenance and As-Needed Repair Services for Ventilators
Alteration
Post-Bid
San Diego, CA

Reported 07/14/2022 12:00 AM
Project Title

Contractor - HVAC Replacement

Physical Address View project details and contacts
City, State (County) Encinitas, CA 92024   (San Diego County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $723,200 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace rooftop AHU at the end of its service life at the UCSD Garden View Medical Plaza, 1200 Garden View Road, Encinitas, CA 92024. The new unit will provide increased air flows to maintain cleanroom pressurization, humidity, and temperature serving the Chemo Compounding Cleanroom, and Hazardous Receiving and Storage room in the 2nd floor Infusion Pharmacy. The new HVAC unit and related condenser, rooftop ducting will be installed and other improvements constructed by contractor while the existing unit continues to serve the pharmacy to minimize down time to existing operations. The new HVAC unit is to be furnished by the contractor, and anticipated lead time to receive the HVAC and condenser equipment is six (6) months. The contractor can commence rooftop and interior work at any time prior to equipment delivery with two (2) weeks prior notice to UCSD.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents