Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Sewer Rehabilitation
Infrastructure
Bidding
El Cerrito, CA

Center Greens Sanitary Sewer Improvements
Term Contract
Bidding
Anaheim, CA

2018-2019 Sewer Replacement
Infrastructure
Post-Bid
$442,200 est. value
Modesto, CA

River Trunk Realignment Gravity System Project
Infrastructure
Post-Bid
$24,970,000 est. value
Modesto, CA

CIPP Fiberglass Pipe Lining
Infrastructure
Results
Sacramento, CA

Cast Iron Sewer Replacement FY 2020-2021 Package IV
Infrastructure
Results
$716,790 est. value
San Jose, CA

Kern River RD Toilet Site Work Project, Sequoia National Forest
Alteration
Design
$250,000 to $500,000 est. value
CA

Terra Linda and Buena Vista Sewer and Water Replacement - Phase 1
Infrastructure
Bidding
$2,212,104 est. value
Santa Rosa, CA

As-Needed Sewer Cleaning and Inspection (Fy22)
Infrastructure
Post-Bid
$1,400,000 est. value
San Francisco, CA

Miscellaneous Sanitary Sewer Repairs FY 20-21 (Package III)
Infrastructure
Results
$700,001 to $800,000 est. value
San Jose, CA

Sanitary Sewer Pipeline Closed Circuit Television Inspection Area 1
Infrastructure
Bidding
East Palo Alto, CA

Water and Wastewater Treatment Chemicals
Term Contract
Post-Bid
Clovis, CA

Sanitary Sewer Rehabilitation (Sub-Basin 85-202)
Alteration
Results
$5,900,000 est. value
Oakland, CA

Last Updated 03/11/2022 12:53 AM
Project Title

Mabury Yard Sanitary Sewer Replacement

Physical Address View project details and contacts
City, State (County) San Jose, CA   (Santa Clara County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $689,025
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally involves abandonment of approx. 900 feet of 10-inch cast iron pipe in the City''s Department of Transportation Mabury Yard. The project will install approx. 900 feet of ductile iron pipe, build new manholes, and reconnect existing sewer service laterals.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents