Similar Projects
West Branch State Park AST System Installation
Infrastructure
Bidding
$295,000 est. value
Ravenna, OH 44266

Mill Creek Metroparks Gasoline and Fuel Oil
Post-Bid
Canfield, OH

Chemical Inventory
Post-Bid
Bowling Green, OH 43402

Compressed Natural Gas (CNG) Fueling System Services
Results
Less than $546,400 est. value
Columbus, OH 43215

Renovation of the Fields Avenue Facility (Underground Storage Tank Removal)
Results
Less than $203,254 est. value
Columbus, OH 43215

Harrison County Airport - Fuel Farm Relocation
Post-Bid
Cadiz, OH

Underground/Aboveground Storage Tanks
Results
Less than $144,640 est. value
Westerville, OH 43081

North Plant Replace CO2 Tank
Infrastructure
Post-Bid
$275,000 est. value
Hamilton, OH

2020 Gas Collection and Control System (GCCS) Construction
Results
Toledo, OH

Ground Aviation Fuel Facility Installation
Infrastructure
Post-Bid
East Liverpool, OH 43920

GCDWR Fuel and Fuel Tank Provider
Results
Chardon, OH

Repair of Queensgate Fuel Piping and Pump Replacement
Infrastructure
Post-Bid
Cincinnati, OH 45214

2020 Miscellaneous Gas Main Replacement
Results
Hamilton, OH 45011

North Plant Replace Caustic Tank
Results
Less than $383,650 est. value
Hamilton, OH 45011

Rehabilitation of Dickey Elevated Storage Tank Job #19402 & Keister Elevated Storage Tank Job #20403
Results
Less than $608,000 est. value
Hamilton, OH 45011

Last Updated 12/07/2021 03:23 PM
Project Title

Unleaded Fueling System Modifications

Physical Address View project details and contacts
City, State (County) Akron, OH 44301   (Summit County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $560,448
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install new unleaded fueling dispensers in each of the two fuel lanes at Akron Metro’s bus facility. Install new 6,000 gallon unleaded fuel storage tank and associated support pad and accessories. Install all required piping from the tank to the dispensers. Connect the unleaded fuel dispensers to an existing Fleetwatch system. Install new fencing and wind protection in locations identified.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents