Similar Projects
Replace Ice Bank Controls - Stocking Hall East
Renovation
Conception
Ithaca, NY 14853

West Point Center for the Humanities
New Construction
Conception
West Point, NY 10996

New Stem Building
New Construction
Design
$6,000,000 est. value
Troy, NY

New Applied Technology Education Center (ATEC)
New Construction - 130,000 SF
Design
$55,000,000 est. value
Troy, NY

Investigate and Repair Facades at Gleeson and Laffin Halls
Bidding
$1,000,000 to $2,500,000 est. value
Farmingdale, NY 11735

Teaching and Learning Innovation Center and Asbestos Abatement
Renovation
Bidding
$1,000,000 to $4,000,000 est. value
NY 10468

Dyson Center
Renovation, Addition - 107,437 SF
Post-Bid
$40,000,000 est. value
Poughkeepsie, NY 12601

Erie Community College City Campus 2018 Various ADA Upgrades
Post-Bid
Buffalo, NY 14203

New Pharmacy School Facility Renovation at Binghamton University
Renovation
Results
Binghamton, NY

Construction Management Services for Monroe Community College Finger Lakes Workforce Development Center
Results
Rochester, NY 14614

Reconstruct Central Heating Plant at Buffalo State College
Construction
$10,000,000 to $15,000,000 est. value
Buffalo, NY 13903

Maria College Campus Development
Renovation, Addition - 1,120 SF
Construction
$5,000,000 est. value
Albany, NY 12208

Yeshivath Viznitz
Renovation - 290,824 SF
Conception
$3,000,000 est. value
Briarcliff Manor, NY 10510

SUNY Morrisville West Hall Bathrooms
New Construction - 58,539 SF
Design
$3,800,000 to $4,500,000 est. value
Morrisville, NY

Rehab Elevators Phase I at SUNY Morrisville
Renovation
Bidding
Morrisville, NY

Reported 01/22/2022 12:00 AM
Project Title

Awosting Hall and Mohonk Hall Rehabilitation and Upper Floor Addition at SUNY New Paltz

Physical Address View project details and contacts
City, State (County) New Paltz, NY   (Ulster County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

First phase of the project is to renovate Awosting Hall an existing 49,400 square foot 3 story residence hall and the addition of a 4th floor, and new steel framed attic with sloped metal roof. Entrance Vestibule and bicycle canopy additions will also be construction. The interior renovations will include the reconfiguration of spaces and installation of floor, wall and ceiling finishes throughout. New mechanical, electrical, plumbing, and fire protection systems will also be provided. Work includes but is not limited to the following in this project: Asbestos abatement, site work including drainage, sewage, supply and distribution, site improvements including roadways, parking lots, site distributions, site development furnishings and equipment, landscaping, selective demolition, concrete work including foundations, footings, foundation walls, and slabs on grade, below grade building construction including excavation, backfill thermal and moisture protection, exterior enclosures including roofs, walls, doors, windows (at new 4th Floor and mechanical mezzanine) and louvers, interior construction including partitions, doors, interior glazed openings and fittings, fire protection specialties, stairs including the stair structure and railings for new 5 story staircase, interior finishes including carpentry, architectural woodwork, and built-in casework, new elevator, fire protection, plumbing, HVAC including controls, instrumentation, and building automation system, electrical including fire alarm, detection systems, communications and security. The second phase of the project is to renovate Mohonk Hall, which is an existing 49,400 square foot 3 story residence hall, and the mirror image of Awosting Hall. The renovation will include complete interior demo of the existing 3 story residence hall, the addition of a 4th floor, and a new steel framed attic with sloped metal roof. Entrance Vestibule and bicycle canopy additions will also be construction. The interior renovations will include the reconfiguration of spaces and installation of floor, wall and ceiling finishes throughout. New mechanical, electrical, plumbing, and fire protection systems will also be provided. Work includes but is not limited to the following in this project: Asbestos abatement, site work including drainage, sewage, supply and distribution, site improvements including roadways, parking lots, site distributions, site development furnishings and equipment, landscaping, selective demolition, concrete work including foundations, footings, foundation walls, and slabs on grade, below grade building construction including excavation, backfill thermal and moisture protection, exterior enclosures including roofs, walls, doors, windows (at new 4th Floor and mechanical mezzanine) and louvers, interior construction including partitions, doors, interior glazed openings and fittings, fire protection specialties, stairs including the stair structure and railings for new 5 story staircase, interior finishes including carpentry, architectural woodwork, and built-in casework, new elevator, fire protection, plumbing, HVAC including controls, instrumentation, and building automation system, electrical including fire alarm, detection systems, communications and security. Phase I – Awosting Hall Construction (May 2020 - July 2021) Phase II – Mohonk Hall Construction (May 2021 - July 2022)

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents