Similar Projects
Residential Plumbing Contractor
Bidding
Detroit, MI

FMO Plumbing and Heating Services
Alteration
Bidding
Waterford, MI

Airport SCBA
Post-Bid
Waterford, MI 48328

Welding/Pipefitting
Term Contract
Post-Bid
Flint, MI 48502

Grand Haven State Park Beach House Renovation
Results
Grand Haven, MI

2020 Chlorine Pipe Replacement
Results
Alpena, MI 49707

300-302 E Ashman Plumbing
Alteration
Bidding
Midland, MI

Plumbing Supplies Strategic Source - 2020
Post-Bid
Detroit, MI

Delta Energy Park Hvac/Plumbing Non-Process Bp11
Results
Lansing, MI

As-Needed Emergency Mechanical and Plumbing Services
Term Contract
Post-Bid
Waterford, MI 48328

Pool Pump Repair Services
Term Contract
Results
Troy, MI

New Station No. 1-Plumbing
Post-Bid
Whitehall, MI 49461

Type "K" Copper Tubing
Results
Troy, MI 48084

DMVA Wide Backflow Preventor Certification, Testing and Repair
Post-Bid
Grayling, MI 49739

Fire Department Hose Testing
Results
Cedar Springs, MI

Last Updated 09/16/2021 08:08 AM
Project Title

Miscellaneous Plumbing Repairs at Pine Towers, Smith Manor and Maloney Manor

Physical Address View project details and contacts
City, State (County) Bay City, MI   (Bay County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include removal and replacement of a wide assortment of copper piping, elbows, tees, adaptors, reducers, couplings, check valves, ball valves, unions, dielectric unions and more for the domestic hot water supply and return lines at two apartment developments and the heating boiler piping at third development all owned by the Bay City Housing Commission. Smith Manor scope of work ground floor, mechanical room. Replace approximately 30 l.f. of 3” copper pipe, elbows, couplings, dielectric union at storage tank; 10 l.f. of 2” copper pipe, 90 degree elbows, two check valves, couplings, unions, flange gaskets for the domestic water heaters. Pine Towers scope of work penthouse, domestic hot water system. Replace a wide variety of 2” (approximately 60 l.f.), 1¼” (10 l.f.), ¾” (10 l.f.) copper piping, 90- and 45-degree elbows, tees, check valves, couplings, tees, caps, ball and check valves (each size), mixing valve, new hangers and supports. Maloney Manor scope of work sixth floor, boiler room. Replace approximately 10 l.f. of 4” and 10 l.f. of 2” copper pipe, elbows, couplings, possible check valve. Reconfiguration of piping is likely because original layout was for three heating boilers and Maloney Manor has two now

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents