Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 est. value
Forest Grove, OR 97116

Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

Ash Drive Pavement Repair
Infrastructure
Bidding
$240,000 CJ est. value
Tigard, OR 97223

Ash Drive Pavement Repair
Infrastructure
Bidding
$240,000 CJ est. value
Tigard, OR 97223

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

Water Transmission Pipeline
Infrastructure
Post-Bid
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

North Pipeline Lateral N1 Relocation at NorthWest Martin Road and Highway 47 for Tualatin Valley Irrigation District
Infrastructure
Results
$25,000 to $100,000 est. value
Forest Grove, OR 97116

Aloha INN PSH Civil Work
Infrastructure
Results
$65,000 est. value
Hillsboro, OR

Century Boulevard/TV Highway Intersection #100294 - Washington County
Infrastructure
Construction
$3,691,800 CJ est. value
Hillsboro, OR 97123

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Cedarbrook of Tigard Senior Living
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Portland, OR 97223

Encompass Health Inpatient Rehabilitation Hospital / Hillboro
New Construction, Infrastructure
Conception
$36,000,000 CJ est. value
Hillsboro, OR 97124

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Last Updated 02/23/2023 11:55 AM
Project Title

4140 SW Watson Stormwater Outfall to Beaverton Creek Retrofit

Physical Address View project details and contacts
City, State (County) Beaverton, OR 97005   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,228,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project has been Rebid The project consists of the installation of approximately 793 lineal feet of 12" diameter and 6 lineal feet of 6" diameter new water main, with 4 water services, 1 hydrant, and associated structures. This project also includes the installation of approximately 17 lineal feet of 12" diameter, 319 lineal feet of 18" diameter, and 5 lineal feet of 36" diameter new storm main, with associated manholes and structures. It also includes the installation of approximately 33 lineal feet of 8" diameter, 253 lineal feet of 15" diameter, and 56 lineal feet of 30" diameter new sanitary sewer main, with associated manholes. In addition to the work described above, the project also consists of the removal of approximately 375 lineal feet of existing water main, sanitary sewer main, and storm sewer piping to accommodate the new piping, and 10 sanitary sewer manholes. The project is in an area with many existing utilities which must be protected; significant utility coordination will be required. The work also includes installation of StormFilter(R) cartridges into an existing vault. The project cost is approximately between $1,000,000 and $1,500,000. Last Day to Submit Written Questions 2/14/2023 Bidders shall acknowledge receipt of all issued Addenda on the Bids. All questions on Addenda should be directed to Michael Phillips, Purchasing Manager, at (503) 526-2229, or at mphillips@beavertonoregon.gov. Subcontractor Disclosure Forms for this project are due no later than 4 p.m. on June 9th, 2022 to Michael Phillips, Purchasing Manager, by fax, (503) 526-2490, or by email, bidmail@BeavertonOregon.gov. Questions that cannot be addressed by direct reference to the Bid Documents may be answered through an addendum issued to all plan holders. A bidder's failure to attend the mandatory pre-bid meeting shall cause the bidder's bid to be deemed non-responsive. he contract expected to be awarded in connection with this solicitation is subject to the state prevailing wage rates under ORS 279C.800 to 279C.875 and/or the federal prevailing wage rates under the Davis-Bacon Act (40 U.S.C. 3141 et seq.). No Bid will be received or considered by the City unless the Bid contains a statement by the Bidder that "Bidder agrees to be bound by and will comply with the provisions of ORS 279C.838, ORS 279C.840 or 40 U.S.C. 3141 to 3148." For more information regarding this project contact: Marisa Cummins, Project Manager, at 503-729-4742. Therefore, the City has adopted an aspirational goal of 10 percent participation of firms certified by COBID in its overall dollar amount of contracting and purchasing activities

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents