Project Title | 4140 SW Watson Stormwater Outfall to Beaverton Creek Retrofit |
Physical Address | View project details and contacts |
City, State (County) | Beaverton, OR 97005 (Washington County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,228,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project has been Rebid The project consists of the installation of approximately 793 lineal feet of 12" diameter and 6 lineal feet of 6" diameter new water main, with 4 water services, 1 hydrant, and associated structures. This project also includes the installation of approximately 17 lineal feet of 12" diameter, 319 lineal feet of 18" diameter, and 5 lineal feet of 36" diameter new storm main, with associated manholes and structures. It also includes the installation of approximately 33 lineal feet of 8" diameter, 253 lineal feet of 15" diameter, and 56 lineal feet of 30" diameter new sanitary sewer main, with associated manholes. In addition to the work described above, the project also consists of the removal of approximately 375 lineal feet of existing water main, sanitary sewer main, and storm sewer piping to accommodate the new piping, and 10 sanitary sewer manholes. The project is in an area with many existing utilities which must be protected; significant utility coordination will be required. The work also includes installation of StormFilter(R) cartridges into an existing vault. The project cost is approximately between $1,000,000 and $1,500,000. Last Day to Submit Written Questions 2/14/2023 Bidders shall acknowledge receipt of all issued Addenda on the Bids. All questions on Addenda should be directed to Michael Phillips, Purchasing Manager, at (503) 526-2229, or at mphillips@beavertonoregon.gov. Subcontractor Disclosure Forms for this project are due no later than 4 p.m. on June 9th, 2022 to Michael Phillips, Purchasing Manager, by fax, (503) 526-2490, or by email, bidmail@BeavertonOregon.gov. Questions that cannot be addressed by direct reference to the Bid Documents may be answered through an addendum issued to all plan holders. A bidder's failure to attend the mandatory pre-bid meeting shall cause the bidder's bid to be deemed non-responsive. he contract expected to be awarded in connection with this solicitation is subject to the state prevailing wage rates under ORS 279C.800 to 279C.875 and/or the federal prevailing wage rates under the Davis-Bacon Act (40 U.S.C. 3141 et seq.). No Bid will be received or considered by the City unless the Bid contains a statement by the Bidder that "Bidder agrees to be bound by and will comply with the provisions of ORS 279C.838, ORS 279C.840 or 40 U.S.C. 3141 to 3148." For more information regarding this project contact: Marisa Cummins, Project Manager, at 503-729-4742. Therefore, the City has adopted an aspirational goal of 10 percent participation of firms certified by COBID in its overall dollar amount of contracting and purchasing activities |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |