Similar Projects
Football Stadium Parking Expansion
Infrastructure
Conception
$4,700,000 est. value
Paradise, CA 95969

San Pedro Waterfront - Berths 74-83 Promenade Phase II - Port of Los Angeles - Construction Division
Alteration
Conception
$16,500,000 est. value
Los Angeles, CA

Wilson Street Widening Design From College Avenue To Fairview Road - City of Costa Mesa
Infrastructure
Design
$15,375,000 est. value
Costa Mesa, CA

R Line Upgrade Phase 2 - Salt Creek Project
Infrastructure
Bidding
$800,000 est. value
Imperial, CA

Coarsegold Fire Station Paving
Infrastructure
Bidding
$300,000 est. value
Coarsegold, CA 93614

Roadway Excavation, JPCP and Furnish Polyester Concrete Overlay
Infrastructure
Post-Bid
$22,300,000 est. value
CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

2021 Redwood Highway Frontage Road Pavement Repair Phase 1
Infrastructure
Results
$350,000 est. value
Mill Valley, CA 94941

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Cedar Grove Improvements - 18050 - City of Chico
Renovation, Alteration
Conception
$465,000 est. value
Chico, CA 95927

Riverland Drive (2H16) Shoulder Widening
Infrastructure
Bidding
$1,635,000 est. value
Redding, CA 96002

Trinidad Fire Station - Potable Waterline Installation or Connection
Infrastructure
Post-Bid
Trinidad, CA 95570

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Scripps Ranch Improvement 1
Infrastructure
Bidding
$5,930,000 est. value
San Diego, CA

Contract for Streets and Sidewalk Maintenance 2021
Infrastructure
Post-Bid
$850,000 est. value
San Luis Obispo, CA 93401

Last Updated 06/16/2022 01:24 AM
Project Title

Sally Street Traffic Calming Project

Physical Address View project details and contacts
City, State (County) Hollister, CA 95023   (San Benito County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,307,715 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will reconstruct Sally Street between Nash Road and Hawkins Street in the City of Hollister. The project also includes replacement of the water main within Sally Street and each intersection within the project. The project will reconstruct the street and curb ramps. New roadway improvements will be conformed to private driveways.

Details

Division 00 - Procurement and Contracting Requirements, Available Project Information, Existing Condition Information, Traffic Information.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents