Similar Projects
RFQ - On Call Right of Way
Term Contract
Bidding
Hayward, CA 94541

H335--Palo Alto Elevator Inspection Base +4Oy
Term Contract
Post-Bid
Livermore, Menlo Park, Mountain View, Palo Alto, San Jose, CA 94304

College of Alameda Construction Management Services Aviation Modernization Phase 2
Renovation, Alteration
Post-Bid
Oakland, CA 94606

Berkeley High School Classroom Building A Project
Renovation
Results
$1,500,000 est. value
Berkeley, CA 94704

District-Wide Hazmat and Testing and Inspection
Infrastructure
Post-Bid
Oakland, CA

On Call Inspection Services
Infrastructure
Post-Bid
Hayward, CA

Material Testing and Special Inspection Services
Infrastructure
Post-Bid
Oakland, CA 94605

AE on Call Quality Assurance and Source Inspection Services
Term Contract
Post-Bid
$14,400,000 to $23,400,000 est. value

Manhole Inspection Program II
Term Contract
Post-Bid

Inspection Services
Infrastructure
Post-Bid
Berkeley, CA

On-Call Civil Engineering and Land Surveying Consulting Services
Term Contract
Post-Bid
San Leandro, CA

On-call Construction Material Testing and Inspection Service
Alteration
Post-Bid
Hayward, CA

On-Call Construction Management and Inspection Services
Term Contract
Post-Bid
$4,500,000 est. value
Alameda, CA

Housing Project No. 2 - Special Testing and Inspection Services
Infrastructure
Post-Bid
$240,000,000 est. value
Berkeley, CA

On-Call Civil Engineering Services: Construction Inspection
Infrastructure
Post-Bid
Newark, CA

Last Updated 10/07/2022 06:03 PM
Project Title

RFP - Data Collection and Before and After Performance Assessment for the Solano I-80 Express Lane Project

Physical Address View project details and contacts
City, State (County) Oakland, CA 94607   (Alameda County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $599,775 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Bay Area Infrastructure Financing Authority (BAIFA) invites firms on the 2021 Transportation Engineering and Planning Services - Cycle 1 Bench under Service Category A: Freeway Operations, Data Analytics and Performance Assessments to assist BAIFA with the Data Collection and Before and After Performance Assessment for the Solano I-80 Express Lane Project. BAIFA is seeking a consultant to provide technical assistance to conduct a Before and After Study to assess the Solano I-80 express lanes corridor operational performance, including the express lanes and the general-purpose lanes. A Before Study is required to establish a benchmark for the operation of the existing I-80 corridor prior to implementation of the express lanes. After the I-80 express lanes begin operations and traffic patterns have stabilized (about 12-month after start of operations), data will be collected again and compared against the baseline conditions and documented in a "Before and After" study. Questions Due Date: Jun 28th 2022, 4:00 PM PDT The method of contractor selection has not been determined at this time.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents