Similar Projects
Snow Removal and Shoveling for West Clinton Station
Term Contract
Post-Bid
Staatsburg, NY 12580

Snow Removal Services for Rockland PC - Hudson River Campus
Term Contract
Post-Bid
Poughkeepsie, NY 12601

2021 Brine Wastewater Hauling and Disposal
Term Contract
Results
Holmes, NY 12531

2021 Pump Station, Wet Well Cleaning and Disposal
Term Contract
Results
Hopewell Junction, Hyde Park, Pleasant Valley, Poughquag, Red Hook, Rhinebeck, Tivoli, NY

Removal and Disposal of Sludge Cake from City of Beacon Wastewater Treatment Facility
Post-Bid
Beacon, NY

Parts Washers and Waste Disposal for Dutchess County
Term Contract, Alteration
Results
NY

Snow Plowing and Snow/Ice Removal Services
Post-Bid
Arlington, Poughkeepsie, NY 12603

Snow Plowing and Snow and Ice Removal Services
Post-Bid
Arlington, Poughkeepsie, NY 12603

Sludge Hauling
Infrastructure
Post-Bid
Fishkill, NY

2021-2023 Community Snow and Ice Removal in Dutchess County
Term Contract
Post-Bid
Amenia, Dover Plains, Millerton, Wingdale, NY 12501

Lamp Recycling, Handling, Removal and Transportation
Term Contract, Infrastructure
Post-Bid

Non-Manufactured Wood Products Grinding and Hauling Lime Kiln Road
Alteration
Post-Bid
Hopewell Junction, NY

Septic Tank Sludge Removal
Term Contract
Post-Bid
Hyde Park, NY

2022 Ice Control Abrasives
Term Contract
Post-Bid
Red Hook, NY

Removal of Bulk Material
Infrastructure
Post-Bid
Poughquag, NY

Reported 02/23/2022 12:00 AM
Project Title

Maintenance of Route 9 and Route 55 Medians

Physical Address View project details and contacts
City, State (County) Arlington, Poughkeepsie, NY 12604   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 02/07/22
Owner View project details and contacts
Architect View project details and contacts
Description

Ongoing clean up and weed removal to be performed along Route 9 (from Sharon Drive to Spackenkill Road) and Route 55 (from Burnett Boulevard to the Wappingers Creek) in the Town of Poughkeepsie. Description: The contractor will provide ongoing cleanup of debris and removal of weeds from the median planting beds and median brick pavers on both highways and the sidewalk pavers on Route 55. The work would include the physical removal of weeds and/or spraying herbicides and pruning overgrown plants. Any plants growing over the brick pavers on Route 9 will be pruned so that they do not grow outside of the planting beds. The work includes all labor and material to remove debris and weeds. Debris includes trash, accumulated sand, leaves, dead plants and weed species.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents