Similar Projects
Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

Salem Street Bridge Replacement - 50231 - City of Chico
New Construction, Demolition
Conception
$3,948,118 est. value
Chico, CA 95928

CA ERFO KLAMATH NF 18N31(1) UPPER WEST BRANCH BRIDGE
Renovation, Alteration
Design
CA

Conejo Canyons Bridge at Hill Canyon Treatment Plant - Cl5527
New Construction, Infrastructure
Design
$1,447,223 est. value
Thousand Oaks, CA 91358

Bridge Deck Rehabilitation
New Construction, Infrastructure
Bidding
$800,000 est. value
Needles, CA

San Bernardino Class 1 Bike Trail Project
Infrastructure
Bidding
$2,000,000 est. value
South Lake Tahoe, CA 96150

Sb Minor B - Joint Repair
New Construction
Post-Bid
$209,000 est. value
CA

Construct New Railroad Bridge and Remove Existing Bridge
New Construction
Post-Bid
$6,400,000 est. value
CA

Buhman Avenue Bridge 2014 Earthquake Repair
New Construction
Results
$1,050,000 est. value
Napa, CA 94558

Gladding Road Over Doty Ravine Bridge Repair Project
New Construction
Results
Auburn, CA

Pomona Avenue Bridge Replacement - 50233 - City of Chico
Infrastructure
Conception
$4,013,882 est. value
Chico, CA 95928

City Wide Bridge Maintenance and Repairs
Renovation
Design
$450,000 est. value
Carson, CA

Construction of the North 1st Avenue Bridge Over the BNSF Railroad
New Construction, Infrastructure
Bidding
$43,680,000 est. value
Barstow, CA 92311

West Silver Eagle Bridge and Overhead Joint Repair
Renovation, Infrastructure
Post-Bid
$565,560 est. value
Sacramento, CA 95834

Bridge Seismic Retrofit and Rock Slope Protection
New Construction, Infrastructure
Results
$8,100,000 est. value
CA

Last Updated 07/01/2022 03:00 PM
Project Title

Main Street Bridge Replacement - 91060 - City Of Ventura

Physical Address View project details and contacts
City, State (County) Ventura, CA 93001   (Ventura County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2025
Bids Due View project details and contacts
Estimated Value $39,425,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, paving and new construction of a bridge / tunnel in Ventura, California. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel. Replace the 1932 Main Street Bridge across the Ventura River with new scour-resistant structure. New bridge to be 56' wide by 1,240' long, with new support piers placed on deep pile footings. The latest Department of Transportation Bridge Inspection indicates that "Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. Immediate action is required to provide scour counter measures." Bridge scour occurs when fast-moving water around a bridge removes sediment from around the bridge foundation, leaving behind scour holes. As of June 30, 2022, this project is included in the City of Ventura's FY 2023-2027 CIP. Information regarding a design team or a general contractor is not available. Construction is anticipated from 2025 to 2027 and be;yond.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents