Similar Projects
Last Updated | 07/01/2022 03:00 PM |
Project Title | Main Street Bridge Replacement - 91060 - City Of Ventura |
Physical Address | View project details and contacts |
City, State (County) | Ventura, CA 93001 (Ventura County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Construction Start Expected June 2025 |
Bids Due | View project details and contacts |
Estimated Value | $39,425,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Demolition, site work, paving and new construction of a bridge / tunnel in Ventura, California. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel. Replace the 1932 Main Street Bridge across the Ventura River with new scour-resistant structure. New bridge to be 56' wide by 1,240' long, with new support piers placed on deep pile footings. The latest Department of Transportation Bridge Inspection indicates that "Bridge is scour critical; field review indicates that extensive scour has occurred at bridge foundations. Immediate action is required to provide scour counter measures." Bridge scour occurs when fast-moving water around a bridge removes sediment from around the bridge foundation, leaving behind scour holes. As of June 30, 2022, this project is included in the City of Ventura's FY 2023-2027 CIP. Information regarding a design team or a general contractor is not available. Construction is anticipated from 2025 to 2027 and be;yond.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |