Similar Projects
Last Updated | 01/05/2022 05:05 PM |
Project Title | Boyer Park Marina Dock Replacement and Repair Project |
Physical Address | View project details and contacts |
City, State (County) | Colfax, WA 99111 (Whitman County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $4,632,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work on this project includes, but is not limited to the following: Removal of existing concrete foam-filled marina floats, steel piles, and gangways. Removal of existing concrete abutments. Repair of existing concrete foam-filled marina floats. Install new fuel float with new sewage pump-out. Install new aluminum fixed pier, aluminum gangway, and aluminum marina floating docks. Install of new lighting, power, and water systems on floating docks. Install of new concrete abutment. Modification of existing guardrail. Completing and complying with all permitting as required. Build a new fuel float with new sewage pump-out, a new fixed pier, gangway, and floating docks with a new personal watercraft float at Boyer Park on the Snake River. The removal of existing floats, piles, and gangways, and the maintenance and repair of the existing floating docks, and minor excavation, grading, and paving, and new signage, navigation aid, and a new pit restroom. This development proposal is within 200 feet of the Snake River. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |