Similar Projects
Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

WDFW - Roses Lake Access Redevelopment Phase Two Rebid - Manson
Infrastructure
Post-Bid
$186,400 est. value
Manson, WA 98831

WDFW - Roses Lake Access Redevelopment Phase 2
Infrastructure
Post-Bid
$186,400 est. value
Manson, WA 98831

Fishers Landing Employee Area and Rose Besserman Room Refresh Project
Infrastructure
Post-Bid
Vancouver, WA 98683

Dock Fender System Replacement
Infrastructure
Post-Bid
$1,231,200 to $1,360,800 est. value
Vancouver, WA

Harbor Island Dock Demolition
Demolition
Results
$4,350,636 est. value
Seattle, WA 98134

Berth 17 Dock Fender System Replacement
New Construction, Demolition
Post-Bid
$1,231,200 to $1,360,800 est. value
Vancouver, WA 98660

POIT Decking Replacement
Infrastructure
Post-Bid
Bremerton, WA

Wenas Creek Fish Passage and Screening Project
Infrastructure
Results
Yakima, WA

Last Updated 01/05/2022 05:05 PM
Project Title

Boyer Park Marina Dock Replacement and Repair Project

Physical Address View project details and contacts
City, State (County) Colfax, WA 99111   (Whitman County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,632,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work on this project includes, but is not limited to the following: Removal of existing concrete foam-filled marina floats, steel piles, and gangways. Removal of existing concrete abutments. Repair of existing concrete foam-filled marina floats. Install new fuel float with new sewage pump-out. Install new aluminum fixed pier, aluminum gangway, and aluminum marina floating docks. Install of new lighting, power, and water systems on floating docks. Install of new concrete abutment. Modification of existing guardrail. Completing and complying with all permitting as required. Build a new fuel float with new sewage pump-out, a new fixed pier, gangway, and floating docks with a new personal watercraft float at Boyer Park on the Snake River. The removal of existing floats, piles, and gangways, and the maintenance and repair of the existing floating docks, and minor excavation, grading, and paving, and new signage, navigation aid, and a new pit restroom. This development proposal is within 200 feet of the Snake River.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents