Similar Projects
Mechanical Services for Virginia Beach City Public Schools
Bidding
Virginia Beach, VA 23456

Building 1602 Replace Chillers JEB Little Creek / Fort Story, Virginia Beach, VA
Post-Bid
$250,000 to $500,000 est. value
Virginia Beach, VA

Facilities Services RTU-13 Replacement and Distribution Services RTU-14 Replacement
Post-Bid
Virginia Beach, VA 23456

Kempsville High School Roof Replacement and Partial HVAC Replacement
Results
Virginia Beach, VA 23464

HVAC Preventative Maintenance and Emergency Service
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA

Make-Up Air Unit Replacements for Louise Luxford, Thalia and Shelton Park Elementary Schools
Post-Bid
Virginia Beach, VA 23456

Chiller Maintenance at Virginia Beach Convention Center
Results
Virginia Beach, VA

Aquarium Marine Science Center Condenser Valve, Heater, Various Ductwork and Increased Chilled Water Flow
Post-Bid
Virginia Beach, VA 23451

Maintenance and Repair Services on HVAC Direct Digital Control Systems
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

2020 Kitchen HVAC Improvements at Glenwood Elementary School
Post-Bid
Virginia Beach, VA 23464

2020 Kitchen Hood Replacements at Creeds, Linkhorn Park, New Castle, Seatack and White Oaks Elementary Schools
Results
Virginia Beach, VA 23456

Replacement of Chilled Water System
Post-Bid
Virginia Beach, VA

Water Source Heat Pump and Install
Results
Virginia Beach, VA 23455

HVAC Preventive Maintenance and On-Call Services
Term Contract
Post-Bid
Virginia Beach, VA 23453

31st Street Parking Garage Chiller Replacement
Results
Virginia Beach, VA

Last Updated 05/05/2020 11:20 AM
Project Title

Advanced Technology Center - HVAC Renovations and Commissioning at Tidewater Community College

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA 23453   (Virginia Beach City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as a complete HVAC Renovation. Work includes; cleaning of the existing ductwork, rebalancing of both the airside and water side systems, replacement of VAV boxes throughout the building, and replacement of the packaged rooftop unit serving the computer room.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents