Similar Projects
Verona High School Facilities Upgrades
Results
Verona, NJ 07044

Elevator Additions at Belleville School 4, 5, 7, 8, 9 and 10
Results
$4,887,000 est. value
Belleville, NJ 07109

Job Order Contracting
New Construction, Renovation, Addition, Build-Out, Demolition
Post-Bid
Newark, NJ

Cafeteria Storefront Replacement at Newark Vocational High School
Renovation, Addition
Results
Newark, NJ 07103

District Wide Facilities ADA Improvements (Phase III)
Renovation
Post-Bid

Locker Room Upgrades at H.B. Whitehorne Middle School
Results
$1,180,000 est. value
Verona, NJ 07044

Disaster Recovery Services
Results

Facility Upgrades at Belleville Middle School
Results
$2,700,000 est. value
Belleville, NJ

Masonry Repointing and Lintel Replacement
Renovation - 6,100 SF
Results
$895,786 est. value
Belleville, NJ 07109

Security Vestibule Upgrades and Alterations at Various Schools
Post-Bid
Millburn, NJ 07041

Elevator Modernization at East Side High School
Post-Bid
Newark, NJ

H.B. Whitehorne Middle School Facilities Upgrades
Results
$2,726,700 est. value
Verona, NJ 07044

Request for Proposals for Interior Renovations
Renovation - 30,000 SF
Post-Bid
Newark, NJ 07102

Brookdale Avenue ES, F.N. Brown ES, Laning Avenue ES Forest Avenue ES Facilities Upgrades
Results
$796,188 est. value
Verona, NJ 07044

Locker Room and Trainer's Room Upgrades and Gym Floor Replacement at Verona High School
Results
$1,180,000 est. value
Verona, NJ 07044

Reported 04/16/2021 01:50 PM
Project Title

Cafeteria Alteration/Addition and Elevator Addition at Millburn Middle School

Physical Address View project details and contacts
City, State (County) Millburn, NJ 07041   (Essex County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced November 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of this project includes select interior alterations / additions. A new three-story addition will be constructed to accommodate a barrier free elevator cab, and a new one-story addition will be constructed to accommodate an expansion to the Cafeteria dining area. The existing courtyard, parking lot, Cafeteria, Kitchen, serving line, second floor corridor, and third floor office will be upgraded / reconfigured to accommodate the programmatic needs outlined above.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 14 - Conveying Equipment, Elevators.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents