Similar Projects
Wastewater Treatment Plant Construction
New Construction
Design
Sterling, IL

Wastewater Treatment Facility Controls Upgrade
Post-Bid
Davis Junction, IL

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

Nordic Wastewater Treatment Plant Rehabilitation
Renovation
Results
$6,000,000 to $8,000,000 est. value
Itasca, IL 60143

Wastewater Treatment Plant Improvements
Results
Tilton, IL 61833

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

Wastewater Treatment Plant Repairs Aerobic Digester Rehabilitation
Results
Rockton, IL 61072

Wastewater Treatment Facility UV Disinfection
Infrastructure
Post-Bid
Metropolis, IL

West Side Water Reclamation Facility 2020 Phase III Expansion
Results
$16,000,000 to $20,000,000 est. value
Saint Charles, IL 60175

Electric Motor Rehabilitation
Renovation
Post-Bid
$380,000 est. value
Chicago, IL

Wastewater Treatment Plant Improvements WWTP #1 Phase D
Results
East Peoria, IL 61611

Repair and Replacement of Certain Portions of the Sludge De-Watering Building
Renovation
Post-Bid
$200,000 est. value
Chillicothe, IL

WWTP and 10th Street Pump Station Improvements
Results
Less than $530,000 est. value
Cairo, IL 62914

AGR - DQSF - Sewage Pump Replacement
Renovation
Post-Bid
Du Quoin, IL

Water System Disinfection Conversion
Results
Northbrook, IL 60062

Last Updated 02/22/2022 04:21 PM
Project Title

Wastewater Treatment Plant Secondary Clarifier Rehabilitation

Physical Address View project details and contacts
City, State (County) Mattoon, IL 61938   (Coles County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $588,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes replacing most of the interior components of the 70` diameter clarifier. The existing concrete structure and underground piping are to remain. The Project includes furnishing and installation of the following Work at the City’s Wastewater Treatment Plant (WWTP): 1. Secondary Clarifier Equipment 2. Electrical upgrades 3. Other work as indicated on the Drawings.

Details

Sewage Treatment Plant, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 09 - Finishes, Painting and Coating.
Division 14 - Conveying Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 40 - Process Integration.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents