Similar Projects
Waialua High and Intermediate, Portables P-7, P-8, and P-9 - Reroof Portables
Renovation
Sub-Bidding
$300,000 CJ est. value
Waialua, HI 96791

Mililani High School Portables P-15, P-16 and P-17 - Reroof Portables
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Mililani, HI 96789

Waikiki Shell - Improvements to Diamond Head Roof
Alteration
Post-Bid
$77,000 est. value
Honolulu, HI 96815

5983 Kako'o Reroof Building, Windward Community College
Alteration
Post-Bid
Kaneohe, HI 96744

Waialua Courthouse Roof Repair
Alteration
Results
Haleiwa, Honolulu, HI 96817

Roof Replacement at FDC Honolulu
Term Contract
Results
$1,000,000 to $5,000,000 est. value
Honolulu, HI 96819

Honolulu Combined ATC Facility Membrane Roof Replacement
Renovation - 69,000 SF
Sub-Bidding
$5,000,000 CJ est. value
Honolulu, HI 96818

Waialua Courthouse Roof Replacement and Water Damage Repairs
Term Contract
Post-Bid
Haleiwa, HI 96712

Biomedical Science Building Roof Improvement Phase 2
Alteration
Results
Honolulu, HI

Open-End Requirements Contract for Roofing Repairs/Installation and Related Work for Miscellaneous Buildings, Various Army Installations on Oahu, HI
Term Contract
Post-Bid
$10,000,000 est. value

Kohala State Office Building
Alteration
Results
$250,000 to $500,000 est. value
Honolulu, Kapaau, HI 96755

Reroof at Waimaha-Sunflower
Alteration
Post-Bid
$400,000 est. value
Waianae, HI 96792

Roof Repairs, Ka`ahumanu Hale
Renovation
Results
$300,000 est. value
Honolulu, HI 96813

Roof Maintenance - Hawaii State Public Library System
Alteration
Post-Bid
Honolulu, HI

Whitmore Community Park Improvement to Roofs, Wood Flooring and Site
Infrastructure, Alteration
Results
$1,181,819 est. value
Wahiawa, HI 96786

Last Updated 12/22/2022 02:03 PM
Project Title

Mililani High, Portables P-12, P-13 and P-14 - Reroof Portables

Physical Address View project details and contacts
City, State (County) Mililani, HI 96789   (Honolulu County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $49,999 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Required Delivery Date: 06/30/2023 Provide cost proposal to furnish labor, materials, and equipment necessary to reroof three (3) portable buildings (Portables P-12, P-13, and P-14) with a single ply roofing membrane system. 1. DEMOLISHING AND DISPOSAL a) The Department assumes the existing roofing system to be asbestos containing materials (ACM). Contractor shall safely remove any ACM in compliance with all applicable laws and regulations from all surfaces/areas specified during the mandatory pre-bid meeting. b) Existing pitch and gravel shall be removed and properly disposed of. c) Contractor shall be responsible for protecting the interior of the classroom building during the entire duration of this project. d) The interior shall be cleaned and restored to original condition at the end of the project. All damages shall be repaired by the contractor to the satisfaction of school officials. e) All debris shall be properly disposed of off-site. 2. WOOD FASCIA, NAILERS, ROOF FLASHING, AND GUTTERS a) All new wood nailers and fascia boards shall be preservative (HiBor) treated to protect against insect and rot. b) Nailers and fascia shall be as indicated on the attached sketches (Attachment A). In general, there shall be: o A double 2x4 nailer around the perimeter of the existing roof deck. o A double 2x6 nailer on each side of the ridge. o A continuous 2x6 fascia around the perimeter of the roof. c) Roof flashing shall be 6" aluminum totaling the perimeter of the roof itself. The color shall match the school colors. d) Gutters shall be aluminum and replaced in kind following the same profile as the existing gutters and downspout system. 3. INSULATION AND BARRIER BOARD a) Rigid roof insulation shall be composed of closed cell polyisocyanurate foam core bonded on each side to fiber reinforced facers, meeting ASTM C 1289 Class I Type II of 20 psi, and ASTM E 84, Flame Spread (foam core) of 25 (polyisocyanurate only, EPS not permitted). Insulation shall have a minimum thermal resistance (R factor) of 19 btu/hr. / sq. ft. b) Barrier board (recovery board) shall be 1/4" thick glass-mat, water-resistant gypsum substrate, meeting ASTM C 1177C 1177M. o Dens-Deck Prime or approved equal (no cellulose materials permitted). c) Insulation and barrier board shall be mechanically fastened to existing roof deck. 4. ROOFING MEMBRANE MATERIALS a) Roofing membrane shall be a single ply (cap sheet) membrane sheet, complying with ASTM D 3909. Width and length of sheet shall be as recommended by the manufacturer. b) In order to comply with the requested twenty (20) year warranty, it shall include SA-SBS cap sheet or SA-APP cap sheet and two layers of SA-Base applied over an approval substrate. c) Roofing membrane thickness shall be a minimum of 60 mils and shall be fully adhered. d) Roofing membrane color shall be chosen by the school. e) New edge flashing shall be as required by roofing system manufacturer. f) Any damaged roof sheeting shall be replaced with new ones. 5. GENERAL NOTES a) All existing plumbing vent pipes shall be extended up high enough to meet current codes. b) All new exposed materials not prefinished from the factory shall be painted to match existing area. c) Any damages caused by the contractor's work shall be repaired and touch up painted to match surrounding area. 6. WARRANTIES a) Contractor shall provide a twenty (20) year manufacturer's product warranty for roofing system from the roofing manufacturer.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents