Similar Projects
Downtown Revitalization Project
Infrastructure
Bidding
$450,000 est. value
Blue Ridge, TX

Intersection Improvements - US75 at Spring Creek Pkwy, Preston Road at Park Blvd, and Headquarters Drive at Dallas North Tollway
Infrastructure
Bidding
$1,076,000 est. value
Plano, TX 75093

Cartegraph Concrete Sidewalk Repairs - 2021
Infrastructure
Post-Bid
$925,000 est. value
Plano, TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Sidewalk Improvements - Plano Parkway from Independence Parkway to Alma Drive Project
Results
Less than $3,440,000 est. value
Plano, TX

2021 Sidewalk Repairs
Results
Frisco, TX

City-Wide Sidewalk Improvements - Phase 3
Infrastructure
Post-Bid
Carrollton, TX

Lavon City Hall Parking Lot
Results
Lavon, TX 75166

Phase 8 Paving Package for Bridgewater
Infrastructure
Post-Bid
TX

Concrete Street and Concrete Sidewalk Repairs
Term Contract
Results
McKinney, TX

Screening Wall Replacement
Infrastructure
Post-Bid
$1,022,329 est. value
Plano, TX 75086

Oak Point Park Nature Preserve Amphitheatre South Parking Lot Trail Replacement
Results
$204,567 est. value
Plano, TX

Paving Facilities for Legacy Hills Phase 1
Infrastructure
Post-Bid
Celina, TX

Concrete Sidewalk Requirement Contract West - 2021
Results
$1,500,000 est. value
Plano, TX

Residential Street Replacement Program
Term Contract, Infrastructure
Post-Bid
$2,000,000 est. value
Carrollton, TX

Last Updated 04/12/2022 12:09 PM
Project Title

Curb and Gutter Project

Physical Address View project details and contacts
City, State (County) Carrollton, TX   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $565,430
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Vendors to provide the City with performing curb and gutter repairs throughout the City. Included in the proposal is a two-year warranty for all jobs completed through the contract period. These repairs will be 18” joint to joint. If the sidewalk behind the curb in gutter is in need of repair (meeting the 90/10 program specs), then that sidewalk will be repaired along with the 18” curb and gutter line. If the street panel in front of the curb in gutter needs repair, then that panel will be replaced, joint to joint.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents