Similar Projects
Ewert Park Improvement - City of Joplin
Renovation, Infrastructure
Conception
$5,829,375 CJ est. value
Joplin, MO 64801

$PRESS - 32nd Street Place - Ross Construction Group LLC
New Construction, Infrastructure
Design
$188,000,000 CJ est. value
Joplin, MO 64801

$PRESS - 32nd Street Place - Ross Construction Group LLC
New Construction, Infrastructure
Design
$188,000,000 CJ est. value
Joplin, MO 64801

SWPA - SUB 169kv Rebuild
Infrastructure
Bidding
$300,000 CJ est. value
Carthage, MO 64836

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

36th Street Improvements
Infrastructure
Post-Bid
Joplin, MO 64804

32nd Street Widening Central City Road to Schifferdecker Avenue
Infrastructure
Results
Joplin, MO 64804

Memorial Park Trail
Infrastructure
Results
Joplin, MO

Performing Arts Center - Carthage R-9 School District
Demolition, New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Carthage, MO 64836

32nd Street Place Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$34,500,000 CJ est. value
Joplin, MO 64804

Resurfacing and Materials 2022
Infrastructure
Post-Bid
MO

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

20th Street Apartments
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Joplin, MO 64801

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Asphalt- Sealcoat and Stripe
Infrastructure
Results
Joplin, MO 64804

Last Updated 12/28/2022 05:32 AM
Project Title

Carl Junction Rte. Z/Pennell St. Sidewalk Improvements, Phase V

Physical Address View project details and contacts
City, State (County) Carl Junction, MO 64834   (Jasper County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $481,972 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes: Construction of ADA compliant ramps and sidewalks, concrete pavement, curbs, gutters, stormwater improvements, and driveways. Bidders with questions concerning this invitation may contact Sean Matlock, P.E., Anderson Engineering, Inc., 1745 South Garrison, Carthage, Missouri 64836, at (417) 392-9265. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher. The City of Carl Junction hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2022 Edition, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The project will be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to waive any informalities or minor defects or to reject any or all bids and to re-advertise and to rebid. All materials for the project shall be tax exempt. Each Bidder must deposit with his/her bid, security in the amount of five percent (5%) of his/her base bid which is subject to conditions provided in the Instructions to Bidders. The DBE Goal for this project is 0 %. No 2nd tier subcontracting will be allowed on this project No Bidder may withdraw his bid within thirty (30) consecutive calendar days after the actual date of the opening thereof. Scope- Carl Junction sidewalk project along Pennell Street from Grimes St. to Dean Rd. Calendar Days: 100 Anticipate Notice to Proceed: February 15, 2023 Completion Date: May 26, 2023

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents