Similar Projects
Replace Waterline
Infrastructure
Design
$900,000 est. value
Centralia, IL 62801

EJ Walsh Sub Water Main Improvements
Infrastructure
Bidding
Joliet, IL

Buell Avenue, Western Avenue, and Reed Street Water Main Improvements
Infrastructure
Bidding
Joliet, IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

Condition Assessment of Water Distribution System Valves
Term Contract
Post-Bid
Washington, IL

White Pines Subdivision Watermain Rehabilitation Phase III
Results
$7,500,000 est. value
Bensenville, IL 60106

2020 Watermain Contract B
Results
Downers Grove, IL 60515

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Water Transmission Main Bid Package 4B
Infrastructure
Bidding
Oak Lawn, IL

Glenside Water Main - Site Utilities
Post-Bid
Glendale Heights, IL 60139

6th Street Water Main Improvements
Results
Peru, IL 61354

Large Diameter Water Meter Testing and Repair/Replacement Services
Term Contract
Bidding
Naperville, IL

On-Call Emergency And Routine Water System Repair Services
Post-Bid
Broadview, Westchester, IL 60155

2020 Small Meter Replacement
Results
Joliet, IL 60432

I-21-4741 Utility Relocation Under Union Pacific Railroad
Infrastructure
Bidding
Franklin Park, IL

Last Updated 12/21/2021 07:00 AM
Project Title

Ridgewood Phase 3 Water Main Improvements

Physical Address View project details and contacts
City, State (County) Joliet, IL   (Kendall County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of the installation of approximately 130 lineal feet of 6-inch ductile iron main, 4,145 lineal feet of 8-inch ductile iron main, 20 lineal feet of 12-inch ductile iron main; water services, lawn restoration; and other miscellaneous items of work. The contract will include all work necessary to install the water main, install water service lines via directional drilling or open cut methods, reconnect existing water service lines, restore the roadway, and perform all restoration to return the area to its original condition.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents