Similar Projects
Reported | 04/11/2020 12:00 AM |
Project Title | Z2PZ--Rebuilding of Gate 4 Support Systems and Opener at Waco |
Physical Address | View project details and contacts |
City, State (County) | Waco, TX 76711 (McLennan County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor shall be responsible for providing all labor, materials, and equipment need for the services required to rebuild Gate 4 at the Waco VA Campus. Work performed will be done at the Central Texas Veterans Health Care Facility in Waco, at 4800 Memorial Drive, Waco, Texas 76504, on Gate 4. After all work is completed, the contractor will have a walkthrough with the VA COR and Operators to ensure all work is completed and ready to receive payment. The contractor shall provide all personnel, services, vehicles, transportation, tools, equipment, materials, supplies, facility supervision, administration supervision and any other item(s) necessary to perform and accomplish this service. The contractor shall be familiar with all the terms, conditions, and requirement herein contained. All work must comply with federal, state and local regulations. All work shall be done according to the Infection Control Risk Assessment (ICRA) specified for the respective areas where work is performed. Project Requirements Base Bid Demo Process Gate 4 Demo Process Demo Gate Opener System Disconnect and/or remove all power, openers, wiring, loops and etc. connected to Gate 4. Remove completely disconnect openers from the concrete pad. Openers will remain onsite. Must mark all control wires to Gate 4. Inspect openers and provide a list of parts need for repairs and updates to the VA Opener System. Demo Existing Track Demo existing concrete that holds the track system. Remove the track system from the concrete Remove any conduit stubbed into the concrete. Haul off all debris and trash per EPA removal process Remove Gate Panels Grinded all weld joints down for a smooth transition between joints. Remove existing rails and panels. Base Bid New Work Gate 4 Rebuild Remove Gate Panels Remount rails on gates using new U-Bolts facing in the correct directions. Install new channel iron on top of each gate panel to help guide gates through new rollers. Install weldable mounting boxes with 4 new 6 in. sealed bearing V-groove wheels. Install 4 new 6 in heavy duty guide rollers. Install New Support System Form and pour a new concrete pad fitted with an installed angle iron track for V-groove wheels. Route all conduits to stub up from the concrete pad within new base risers, this will improve the look of the gate, increase safety, and reduce tripping hazards while protecting surrounding openers Rebuild Gate Opening System Inspected all marked control wiring and replace if necessary. Inspect existing opener and repair. Install the following: 2 new radio receivers, 2 new 12 in. Hysecurity base risers, 4 monitored UL 325 reflective phone eyes with hoods. Install mounting posts for photo eyes and 2 seven-day timers. Make sure all connections are secured. Reinstall openers and reconnect all control wiring/control loop. Reconnect power and test opener system to ensure gate 4 is operable once again. At the end of the project clean up and haul off any debris, extra materials or waste that has accumulated during the project in accordance with EPA Guidelines and Regulations. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |