Similar Projects
Panera Bread / Roseville
New Construction, Infrastructure - 4,150 SF
Conception
$1,300,000 CJ est. value
Roseville, MN 55113

Panera Bread / Roseville
New Construction, Infrastructure - 4,150 SF
Conception
$1,300,000 CJ est. value
Roseville, MN 55113

Riversedge - Phase 2
New Construction, Infrastructure
Design
$220,000,000 CJ est. value
Saint Paul, MN 55102

Riversedge - Phase 2
New Construction, Infrastructure
Design
$220,000,000 CJ est. value
Saint Paul, MN 55102

Saint Paul Regional Water Services - Repairs of 60 Inch Mississippi Concrete Conduit
Infrastructure
Bidding
$200,000 CJ est. value
Saint Paul, MN 55101

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Guidant John Rose Minnesota Oval Ice System Improvements - Bid Package 2 - Site
Renovation, Infrastructure
Results
Roseville, MN 55113

Twin Lakes Station Demolition and Sitework
Demolition, Infrastructure
Construction
Roseville, MN 55113

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

Rice Creek Commons - Outlot A
New Construction, Infrastructure - 1,400,000 SF
Pending Verification
$750,000,000 CJ est. value
Arden Hills, MN 55112

Rice Creek Commons - Outlot A
New Construction, Infrastructure - 1,400,000 SF
Pending Verification
$750,000,000 CJ est. value
Arden Hills, MN 55112

Signal Replacement - TH 35E
Infrastructure
Conception
$800,000 CJ est. value
Little Canada, MN 55117

Maplewood Assisted Living
New Construction, Infrastructure - 17,233 SF
Design
$4,600,000 CJ est. value
Maplewood, MN 55109

Reported 08/03/2023 12:00 AM
Project Title

Fire Station No. 7 - New Facility

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55106   (Ramsey County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction Start Expected 2023,
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2.1 Contractors must assume the responsibility to examine all sections of the drawings to determine the full extent of the work. Contractors shall verify dimensions in the field, as required and examine existing job conditions and adjoining construction which may affect the acceptability of this work. 2.2 Protect building from unauthorized intrusions at all times. Provide secure temporary enclosures for all building openings at the end of each workday. 2.3 The Contractor shall comply with manufacturers' recommendation on environmental conditions at the time of application of the work. 2.4 Install all materials supplied for this project in accordance with the drawings and the manufacturers instructions. 2.5 The Contractor shall deliver, to the Owner, all items which have been designated to be salvaged and are to be retained by the Owner. All other items not designated by the Owner shall become the property of the Contractor, who shall dispose of it in an approved manner. AET Project No. P-0013055 City of Saint Paul Fire Department is looking for bids on Fire Station 7 Site Improvement. Construction of a new fire station to include site improvements and construction of a new facility. Install all materials supplied for this project in accordance with the drawings and the manufacturers instructions. The Contractor shall deliver, to the Owner, all items which have been designated to be salvaged and are to be retained by the Owner. All other items not designated by the Owner shall become the property of the Contractor, who shall dispose of it in an approved manner. Q And A Open: 06/26/2023 08:00:00 PM Q And A Close: 07/12/2023 02:00:00 PM This project is covered by Minnesota prevailing wage statutes. Wage rates listed below are the minimum hourly rates to be paid on this project. The City reserves the right to accept/reject any or all bids or portions thereof, and further, reserves the right to accept/reject any or all subcontractors. Under direct supervision of a Professional Structural Engineer experienced in design of this Work and licensed in the State in which the Project is located.

Details

29,739 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents