Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Utilities - US 62
Infrastructure
Design
$250,000 CJ est. value
Muskogee, OK 74401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Contractor - Webbers Falls Unit 1 Speed Increaser Rehab
Infrastructure
Bidding
$10,000,000 CJ est. value
Webbers Falls, OK 74470

Construction of Section A and B
Infrastructure
Post-Bid
Taft, OK

Relocation of 570 LF of 4" and 2" PVC Water Main and 295 LF 4" Bore and Casing and 115 LF 8" Bore and Casing
Infrastructure
Post-Bid
Webbers Falls, OK

Muskogee Water Distribution Interconnects Package C
Infrastructure
Results
Muskogee, OK

Water Line Leak Repair, Fire Hydrant Replacement and Street Cut Repair
Infrastructure
Results
$1,120,000 est. value
Muskogee, OK

St. Francis - Enabling Construction Projects
Renovation, Infrastructure - 8,220 SF
Construction
$1,515,000 CJ est. value
Muskogee, OK 74401

2019 Bond - Early Childhood Center - Muskogee Public Schools
New Construction, Infrastructure, Renovation
Pending Verification
$6,000,000 CJ est. value
Muskogee, OK 74401

Whataburger / Muskogee
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Muskogee, OK 74401

Widen and Resurface - US 64
Infrastructure
Design
$3,600,000 CJ est. value
Muskogee, OK 74403

USMS Active Vehicle Barriers
Infrastructure
Bidding
$500,000 CJ est. value
Muskogee, OK 74401

Furnish and Install a Water Service Line
Term Contract
Post-Bid
Muskogee, OK 74401

Three Forks Harbor Wash Pad Improvements
Infrastructure
Results
$100,000 CJ est. value
Muskogee, OK 74401

Last Updated 02/22/2023 03:06 AM
Project Title

Utilities - US 62

Physical Address View project details and contacts
City, State (County) Muskogee, OK 74401   (Muskogee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-62: From 0.26 Mi N of Cloud Creek, N 7.86 Mi to Us-62/us-64/sh-16 Jct.ut for 34349(04) As of February 22, 2023, the project is in Conceptual status. Anticipated letting month/year is November, 2023. Length : 7.860 Mi OKDOT - Utilities - US 62 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents