Similar Projects
Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

Hilltop Plant Stairs Screens Replacement - City Of Kingman
Alteration
Conception
$500,000 est. value
Kingman, AZ 86401

US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 1 - Arizona Department of Transportation (AZDOT)
Infrastructure
Design
$70,000,000 CJ est. value
Kingman, AZ 86401

Ramar Road Drainage Improvements - City of Bullhead City
Infrastructure
Design
$1,050,000 CJ est. value
Bullhead City, AZ 86442

SR 95 - Sara Park To I-40
Infrastructure
Bidding
$32,000,000 CJ est. value
Lake Havasu City, AZ 86404

Quartzsite-Parker-Topock Highway (SR 95)
Infrastructure
Bidding
$32,000,000 CJ est. value
Lake Havasu City, AZ 86404

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Community Water and Wastewater Service for Fayeanne Crook Homesite
Infrastructure
Results
Peach Springs, AZ

Animal Shelter Trenching
Infrastructure
Results
Kingman, AZ 86409

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

Trails at Black Mountain
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Bullhead City, AZ 86442

Airway Avenue Drainage Improvements - City of Kingman
Infrastructure
Conception
$2,750,000 est. value
Kingman, AZ 86409

AutoZone # 5301 / Pomona
New Construction, Infrastructure - 6,800 SF
Design
$1,500,000 CJ est. value
Bullhead City, AZ 86442

RFP D/B - Two Single-family Homes in Peach Springs
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Peach Springs, AZ 86434

Last Updated 02/08/2023 03:35 PM
Project Title

Manhole Rehabilitation - Rebid

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ 86429   (Mohave County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $935,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Bullhead City, Arizona is extending an Invitation for Bid for the installation of Armorock epoxy resin manhole inserts, and the removal and replacement of the concrete collars, frames, covers, and manhole riser rings on 39 existing sanitary sewer manholes and other work as necessary for the completion of the project in accordance with the Project Specifications. Bypass pumping (or other approved method) will be required at all manholes to repair and coat all manhole benches and channels within this project. The manholes are in various locations throughout the City. The City of Bullhead City Utilities Department will provide the Armorock manhole inserts, Ram-Nek mastic sealant, epoxy coating for the bench and channel, Pro-Ring (EPP) Grade Rings, EJ COM 3200 composite frames and lids. The contractor will be responsible for providing M1 Adhesive/Sealant as recommended by Cretex to adhere the grade rings, concrete, cement slurry, grout, or any other materials not provided by the City at no additional cost to the City. The City inspector may elect to salvage manhole lids and/or frames at inspector's discretion. The contractor will be responsible for proper disposal of all other removed materials including but not limited to cast iron frames and lids, concrete collars, concrete cones, asphalt and debris cleaned from each manhole at no additional cost to the City. Project must be complete within 120 days of the Notice to Proceed. Brief procedural questions concerning this IFB can be directed to Crystal Wilson, Administrative Analyst, 2355 Trane Road, Bullhead City, Arizona 86442 (928) 763-9400 ext. 8840, FAX (928) 763-0131 or by email at crwilson@bullheadcityaz.gov. Technical questions regarding this IFB can be directed to Ryan Farnell, Utilities Construction Manager, by email at rfarnell@bullheadcityaz.gov and received no later than 12:00 PM Arizona time on January 13, 2023. Questions may then be responded to by written amendment to this document. Oral statements or instructions do not constitute an amendment to the IFB.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents