Similar Projects
ISU Lecture Center: Chiller Replacement
Renovation
Design
$195,000 CJ est. value
Pocatello, ID 83209

HVAC Services
Term Contract
Sub-Bidding
Boise, ID 83702

Air Handling Unit Installation Project
Alteration
Post-Bid
Burley, ID

Replace Chiller, Data Room
Alteration
Post-Bid
$179,000 est. value
Boise, ID 83702

HVAC System Replacement
Renovation, Alteration
Results
Potlatch, ID

Gas Fired Boilers
Alteration
Results
Less than $200,000 est. value
Twin Falls, ID 83301

HVAC and Fire Sprinkler Upgrade
Alteration
Post-Bid
$2,228,000 est. value
Orofino, ID 83544

Magic Valley Regional Airport - Terminal Heat Pump Replacement
Alteration
Results
Twin Falls, ID 83301

NWB Shoshone Outbuildings - 50% CD
Alteration
Post-Bid
Preston, ID

Acoustic Mitigation Isolation, Phase 1
Renovation, Alteration
Results
$2,400,000 est. value
Moscow, ID

Replace Roof and Upgrade HVAC Units, Canyon County Center,College of Western Idaho
Alteration
Post-Bid
$765,000 est. value
Nampa, ID 83651

Dehumidification Replacement
Alteration
Results
Idaho Falls, ID

Burley Junior High School HVAC Upgrades
Alteration
Post-Bid
$580,000 est. value
Burley, ID 83318

Center Chiller Replacement
Alteration
Results
$360,000 est. value
Boise, ID 83725

Advantage Plus Credit Union Boiler Replacement
Renovation
Post-Bid
$400,000 CJ est. value
Pocatello, ID 83201

Last Updated 10/06/2022 10:23 AM
Project Title

Replace Chiller - Physical Science Building

Physical Address View project details and contacts
City, State (County) Pocatello, ID 83209   (Bannock County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $515,893 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A description of the work of this project can be summarized to include demolition and removal of existing 150 ton chillers and associated primary pumps, complete installation of new similarly sized chillers and pumps, upgraded DOC infrastructure associated piping and electrical work. Alternate 1 work involves replacing three pneumatically controlled three-way valves with new electronically controlled three-way valves. Alternate 2 work involves an upgrade to a more efficient chiller model only and does not affect other base scope requirements. Proposals will be opened and publicly read at the above hour and date. A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. A Public Works Contractor's License for the State of Idaho is required to bid on this work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents