Similar Projects
Last Updated | 09/12/2023 03:49 PM |
Project Title | Sweetwater Middle School HVAC Renovations |
Physical Address | View project details and contacts |
City, State (County) | Lawrenceville, GA 30044 (Gwinnett County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2024 |
Bids Due | View project details and contacts |
Estimated Value | $1,750,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract, if awarded, will be on a stipulated sum basis for the project listed above. No bids may be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by a bid bond payable to GWINNETT COUNTY BOARD OF EDUCATION, in the amount equal to five percent (5%) of the base bid, (certified checks are NOT acceptable). Performance Bond, and Labor and Material Payment Bond, each in amounts equal to 100% of the Contract Sum, will be required of the successful bidder. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia be listed on the "Department of Treasury" Circular 570, and have an A. M. Best Company rating of minimum Class "A" , with financial size VI or better. A Payment Bond and a Performance Bond, in the amount 100% of the value of the respective subcontractor's work, will be required of the Fire Proofing, Mechanical/HVAC, Plumbing, Sprinkler, Electrical, and Roofing Subcontractors. Bidders who do not submit the A305 Statement will be subject to disqualification. The A305 must show the Contractor's ability to complete the Contract in a satisfactory manner on projects of similar scope and complexity. References from past clients and projects must be included and will be verified. Time is of the essence. A written Notice to Proceed will be issued after the Pre-Construction Conference upon acceptance and approval of all Contracts, Bonds, Insurance, etc. Contractor shall mobilize within ten (10) days of the date of the written Notice to Proceed. The start date for the work will be May 23, 2024. All work outlined in the Contract Documents must be substantially complete by July 19, 2024. The Owner will make paymentsto the successful Contractor upon receipt of Requestsfor Payment, approved by the Architect, as fully covered and shown in the Contract Documents. Retainage and described in the specifications and General Conditions of the Contract will be withheld. The above description is an advertisement for submission of bids; bids are to be considered as offers for performance of work by the submitting party. The Owner reserves the right to accept or reject any or all bids and to waive technicalities Submit all questions by e-mail: ccaudle@husseygaybell.com sferry@husseygaybell.com Question Deadline 08/28/2023 at 4:00 PM ET |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |