Project Title

Y1JZ-- Project # 675-20-113 - Lakemont Roof Maintenance - Replacement

Physical Address View project details and contacts
City, State (County) Orlando, FL 32827   (Orange County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Orlando VA Medical Center (OVAMC) has a requirement to ensure facility existing roof is (i.e. Protected Membrane Roofing - Cold Applied Membrane Waterproofing Systems) operational to ensure safe sterile environment for staff and veterans. The Contractor shall furnish all labor, materials, travel, and equipment to replace roofing/systems. • Current roof inspections shall be performed. The Contractor shall contact the COR to request any deviations from this schedule in advance. • Set up proper safety areas in the immediate areas while work is to be performed. • Remove existing coping metal and metal counter flashings totaling 152’ LF. • Remove roofing and dispose material down to structural concrete deck totaling 1300’ SF. • Prep surface of structural concrete deck and apply asphalt primer at a rate of 1 gallon per 500 SF over a total of 1300’ SF. • Install MB smooth base sheet over primed structural concrete acting as vapor barrier totaling to. • 1785’ SF. (includes wall flashings). • Install tapered insulation process with cold process adhesive over 1560’ SF complete with. • crickets to divert water to scuppers. • Install MB base sheet over 1785’ SF of newly installed tapered insulation and walls. • Install MB cap sheet over 1785’ SF of newly installed base sheet. • Flash 2- 8”x4”x12” scupper box per NRCA guidelines. • Install 2”x12” treated wood nails totaling to 130’ LF. • Install cleats to nails 12” O.C. totaling to 130’ LF. • Install coping cap to cleats and secure on interior side every 6” O.C. using stainless steel. • fasteners complete with neoprene washers totaling to 130’ LF. Ensure coping caps are complete with sealant. • Terminate interior wall flashing with termination bar and ¼”x1 ¼” tapcon fasteners complete with sealant. • Cut 1 ¼” into brick mortar joint and install 2-piece metal Reglet into mortar. • Fill empty space in mortar with like materials and seal with urethane sealant. • Flash 1 lightning rod using 4”x4” pitch pan per NRCA guidelines. • Clean the entire site of all construction debris affiliated with the working area. • Contractor shall provide a Labor and Year Materials Warranty upon completion and inspection. Upon completion of the warranty, contractor can provide a warranty renewal option at the end of the life of the warranty.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents