Similar Projects
Address Pavement Condition
Infrastructure
Conception
$3,250,000 CJ est. value
Elizabethtown, KY 42701

Construct West End Zone Club Space - University of Kentucky
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Lexington, KY 40508

Asphalt Resurfacing - KY 100
Infrastructure
Design
$300,000 CJ est. value
Franklin, KY 42134

Highlands Property Mixed-Use Development
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$1,370,000 CJ est. value
Louisville, KY 40202

City of Providence Sidewalks
Infrastructure
Bidding
$700,000 CJ est. value
Providence, KY 42450

Irrigation Improvement Project
Infrastructure
Bidding
$1,825,956 CJ est. value
Bowling Green, KY 42103

Elevated Water Storage Tank Painting, Modifications and Repairs
Infrastructure
Post-Bid
Campbellsburg, KY

Pipe and Fittings
Alteration
Post-Bid
Frankfort, KY

Distribution System Site Development
Renovation
Results
Burgin, Harrodsburg, KY 40330

Distribution System Site Development
Renovation
Results
Burgin, Harrodsburg, KY 40330

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

Brownsboro Road Mixed Use
New Construction, Infrastructure - 9,775 SF
Pending Verification
$12,000,000 CJ est. value
Louisville, KY 40241

Construct Event and Conference Center - Murray State University
New Construction, Infrastructure
Conception
$8,198,000 CJ est. value
Murray, KY 42071

Freys Hill Road New Apartments
New Construction, Infrastructure
Design
$120,000,000 CJ est. value
Louisville, KY 40241

Bath County Judicial Center
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Owingsville, KY 40360

Last Updated 09/29/2022 10:38 AM
Project Title

Contract 3 Campton Tank Replacement Project

Physical Address View project details and contacts
City, State (County) Campton, KY 41301   (Wolfe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to include installation of two (2) duplex pump stations, telemetry, and electrical service. Bids will be received for a single prime Contract. Bids shall be on a unit price basis, unless otherwise noted. Questions regarding this project must be received by Nesbitt Engineering, Inc. (859-753- 0200 bgreenwell@nei-ky.com) in writing no later than 5:00 pm on 09/28/2022. Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, Non segregated facilities order 32FR 7439, and the Contract Work Hours Standard Act. This project will be in compliance with, and bidders must comply with Executive Order No. 11246 (EEO) as amended, prohibiting discrimination in employment regarding race, creed, color, sex or national origin. Contractors/subcontractors will comply with 41 CFR 60-4, (affirmative action), to insure equal opportunity to females and minorities and will apply the time tables and goal set forth in 41 CFR 60-4. This contract is subject to federal wage rates. Bidders will make positive efforts to use small, minority, women owned and disadvantaged businesses. DBE's are encouraged to bid. The owner reserves the right to waive any informality or to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Bid award will be made to the lowest, responsive, responsible bidder. City of Campton - Water Tank/Line Extension Project - Contract 3 1062.05

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents