Similar Projects
The Tracks
New Construction, Infrastructure
Design
$41,000,000 est. value
Birmingham, AL 35233

Flint River Drive Parking Lot Improvements
Infrastructure
Bidding
$600,000 est. value
Tuscaloosa, AL 35404

A New Parking Deck
Infrastructure
Bidding
$875,000 est. value
Decatur, AL

Multi-Use Recreational Trail Expansion along SR-1 (US-431)
Post-Bid
$1,000,000 to $2,000,000 est. value
Guntersville, AL 35976

Bayfront Street Scape and Parking Improvements
Post-Bid
Daphne, AL 36526

Downtown Streetscapes Phase IV and Phase V
Results
Less than $430,000 est. value
Lanett, AL 36863

City Hall Parking Lot Addition
Results
$150,000 to $225,000 est. value
Daphne, AL

Moniac Sidewalk and Tullis Manor Driveways
Alteration
Construction
Atmore, AL 36502

Son's Ford Parking Lot
Infrastructure
Pending Verification
Auburn, AL

Bob Williams Subdivision
Infrastructure
Pending Verification
Mobile, AL

Parking Lot for Etowah County Mega Sports Complex
Infrastructure
Bidding
$200,000 est. value
Rainbow City, AL 35906

Whistler Street Sidewalk Improvements
Post-Bid
$158,650 to $193,895 est. value
Prichard, AL 36610

Rock Quarry Boat Landing Parking Lot Improvements
Results
$322,361 est. value
Cottondale, AL 35453

Office Gravel Parking Lot
Infrastructure
Pending Verification
AL 36303

Phase II - Road Improvements and Parking Lot Repairs at Alabama A and M University
Infrastructure
Bidding
$300,000 est. value
Huntsville, AL 35810

Last Updated 07/04/2022 08:14 AM
Project Title

South Lamar School Parking Lot Rehabilitation

Physical Address View project details and contacts
City, State (County) Millport, AL 35576   (Lamar County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: rehabilitation of drives and parking areas serving the South Lamar School facility. A. Extent of demolition is indicated on the Plan. B. Remove paving and curbs as required to accomplish new work. C. Remove items indicated D. Remove other items indicated, for salvage, relocation, and recycling. E. Salvage, relocate, or recycle as directed and as applicable. a. The Owner reserves the right of first refusal for any structures, materials, and/or accessory items on site or within the buildingsincluding, but not limited to, fire alarm panels and accessories, door hardware, electrical transformers, copper tubing, onsite trees and shrubs, and other items of value that may or may not be shown on the plans or called out in the project manual. Any items removed from the site without prior approval from the Owner will be paid to the Owner by the contractor at two times (2x) the market value.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents