Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Airport Stormwater Improvements
Bidding
Less than $571,000 est. value
Stuart, FL 34996

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Meigs Drive Stormwater Improvements
Results
Less than $705,895 est. value
Crestview, FL

Reitz Union Lawn Inner Road Thermal Infrastructure Improvements - CM-At-Risk
Results
Less than $15,000,000 est. value
Gainesville, FL

Stormwater Improvements
Construction
Lake City, FL 32055

South Campus Stormwater Management - DRA #4 Project
Post-Bid
Pembroke Pines, FL 33024

Maintenance of Stormwater and Sanitary Sewer Structures
Results
Less than $150,000 est. value
North Miami, FL 33161

Abandonment of Existing Septic System
Post-Bid
Orlando, FL 32805

Stormwater Harvesting Pilot Project
Results
Less than $700,000 est. value
Middleburg, FL 32068

Blue Lake Elementary - Stormwater Drainage Upgrade
Post-Bid
De Land, FL 32724

Gaberonne Swamp Stormwater Pensacola Bay Watershed Improvements Langley Avenue Diversion Box and Storm Conveyance Project
Results
Pensacola, FL 32502

Georgia and Pennsylvania Avenue Stormwater Improvements
Post-Bid
Lynn Haven, FL 32444

Storm Inlets and Grates
Term Contract
Results
Cape Coral, FL 33915

Last Updated 06/02/2021 09:59 AM
Project Title

Ponce De Leon Circle Septic to Sewer Project

Physical Address View project details and contacts
City, State (County) Ponce Inlet, FL   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,076,275
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace all the top rail boards on the Ponce Preserve Boardwalk, west of South Peninsula Drive. Includes removal and haul-away of all of the old top rail boards; replacement of all top rail boards with new Wear Deck boards (approximately 4,000 linear feet); and New hardware (3” stainless steel deck screws). Board sizes vary in length between 10 ft., 12 ft., 16 ft., and 20 ft.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents