Last Updated | 09/14/2023 06:11 PM |
Project Title | Sequoia Energy AMLProject |
Physical Address | View project details and contacts |
City, State (County) | Frankfort, KY 40601 (Franklin County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Results Expected, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $204,800 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 23034BFPFMPO In this phase the intent is to begin reclamation of the Lovely Branch impoundment by establishing an open channel spillway at the location of the existing principal spillway pipe. The construction of the channel will begin near the inlet of the existing pipe and proceed towards the embankment. As the excavation proceeds we will evaluate the feasibility of constructing a temporary inlet on the principal spillway if the crushed sections can be removed and the remaining pipe is suitable. The crushed section should be approximately within 500 ft of the inlet. Materials removed may be placed on the northern side of the beach area and crowded into the pool area. Best management practices are to be employed to reduce sedimentation. Yardage will be verified by comparing pre-project baseline survey to the then "current" conditions. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |