Similar Projects
SR 826/Palmetto Expressway Capacity Improvement Project (FPID)
Bidding
Miami Lakes, FL 33014

Resurfacing
Bidding
$6,024,990 est. value
FL

Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Miami Circle
Post-Bid
Miami, FL 33131

Roadway Improvements Project - Northeast 125th Street
Results
North Miami, FL 33161

Miscellaneous Roadway and Drainage Improvements
Results
Cutler Bay, FL 33189

Intersection Improvement
Bidding
$4,726,324 est. value
FL

DMS Courtyard Replacement
Post-Bid
Miami, FL 33128

Push Button Roadway Resurfacing-North
Results
Less than $1,620,984 est. value
Miami, FL

Railroad Intersection Improvement
Bidding
$34,326,701 est. value
FL

Jackson North Medical Center Asphalt Repairs (SBE Set Aside)
Post-Bid
Less than $50,000 est. value
Miami, FL 33169

Push Button Roadway Resurfacing- South
Results
Less than $1,620,984 est. value
Miami, FL

Push Button Intersection Improvements-North
Bidding
$1,583,934 est. value
FL

Rickenbacker Causeway Green Bike Lanes Segment A - Phase I
Post-Bid
Less than $1,950,000 est. value
Miami, FL 33128

207th Street Right Lane Extension
Results
Less than $302,280 est. value
Miami Gardens, FL 33056

Last Updated 02/11/2021 02:23 PM
Project Title

Roadway Resurfacing-Multiple Sites

Physical Address View project details and contacts
City, State (County) Miami, FL 33128   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,456,426
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not limited to the following: Milling and resurfacing, widening and resurfacing of intersecting streets, up to the existing joint at the side street or up to the point of curvature as determined by the Engineer or as indicated in the Plans, resurfacing of asphaltic pathways (pedestrian, bicycle, etc.) adjacent or not to the edge of pavement as necessary, temporary utility repairs (cold patches), clearing and excavating of shoulder areas or build-up, as directed by the Engineer; grading and clean-up of adjacent shoulders and removal of roots, as required, pavement markings including the installation of reflective pavement markers (blue/blue) at fire hydrant locations, sidewalk, sidewalk curbs and connectors, and pedestrian ramps. The Engineer will make the final determination of any changes required due to conflict of design and or field conditions. Location of Work 1) NE 191 St -NE 199 St & N Miami Avenue -NE 2 Ave 2) NW 57 PI from NW 194 St to NW 198 Ter 3) NE 181 St from NE 6 Ave to NE 8 Ave 4) NW 12 Ave from NW 143 St to NW 147 St 5) NW 1 Ave from NW 131 St to NW 143 St 6) NW 36 Ave from NW 67 St to NW 71 St 7) NW 26 Ave & NW 69 St 8) NE 6 Ave-West Blscayne Canal Rd & NE 107 St-NE 119 Ter 9) NW 20 St from NW 27 Ave to NW 37 Ave 10) SW 128 St from SR821 to SW 127 Ave 11) SW 47 St from 5W 132 Ave to SW 137 Ave 12) SW 216 St from 5W 194 Ave to SW 202 Ave 13) SW 107 Ave from Old Cutler Rd to Sw 224 St 14) SW 200 St from SW 182 Ave to SW 187 Ave 15) SW 149 Ave from Coral Way to Bird Rd 16) SW 4 St-SW 8 St & SW 87 Ave-Sw 92 Ave 17) NW 7 St from NW 62 Ave to NW 65 Ave 18) NW 64 St from NW 72 Ave to NW 74 Ave

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents