Similar Projects
Autumn Grove
New Construction
Design
Avon, OH 44011

Ridgefield Subdivisions - Phase I
New Construction
Design
North Ridgeville, OH

Mechanic Street / Crook Street Improvements Phase 2 - Rebid
Infrastructure
Bidding
$1,618,000 CJ est. value
Grafton, OH 44044

Campana Park Improvements Project
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Lorain, OH 44053

RFQ Design - New Fire Station Facility
New Construction, Infrastructure - 12,000 SF
Post-Bid
$3,000,000 CJ est. value
Grafton, OH 44044

City of Avon, New Construction of Park Restrooms
New Construction, Infrastructure
Post-Bid
$784,100 CJ est. value
Avon, OH 44011

Fire Repairs of the Damaged Unit - 1856 Reeves Avenue
Renovation
Results
Lorain, OH 44052

Fire Repairs of the Damaged Unit - 2207 West 24th Street
Renovation
Results
Lorain, OH 44052

Mass Estates
New Construction - 89,947 SF
Construction
Avon, OH 44011

West Ridge Road Development
New Construction
Construction
Elyria, OH 44035

Pony Trail Crossing
New Construction
Pending Verification
Lorain, OH 44053

Eagle Meadow
New Construction - 666,295 SF
Pending Verification
$10,000,000 CJ est. value
North Ridgeville, OH

Roadway Minor Rehab
Infrastructure
Design
$1,487,000 CJ est. value
Elyria, OH 44035

Eastview Avenue Sanitary Sewer Extension
Infrastructure
Bidding
$300,000 CJ est. value
North Ridgeville, OH 44039

Pawlak Park Improvements
Infrastructure
Post-Bid
$229,563 CJ est. value
Lorain, OH 44052

Last Updated 10/07/2022 11:12 AM
Project Title

Grande Esplanade

Physical Address View project details and contacts
City, State (County) North Ridgeville, OH 44039   (Lorain County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Seeking Site Plan Approvals, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $5,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 7, 2022, this project is in site plan approvals. The architect is not released, and no method of selection for contractor has been announced. There is no firm timeline established.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents