Similar Projects
Ohr Chaim Meir High School
New Construction
Conception
Lakewood, NJ 08701

New High School
New Construction
Conception
$241,000,000 est. value
Hoboken, NJ 07030

Christian Brothers Academy Campus Improvements
Renovation, Addition - 17,211 SF
Design
$6,000,000 est. value
Lincroft, NJ 07738

LEAP Academy Community Fab Lab
New Construction, Demolition
Design
Camden, NJ 08102

Renovations to West Windsor-Plainsboro High School North
Renovation
Bidding
$2,000,000 est. value
NJ 08536

Cape May City Library at the Historic Franklin Street School Renovation
Renovation
Bidding
$1,250,000 est. value
Cape May, NJ 08204

Toilet Upgrades at Hillside High School
Post-Bid
Hillside, NJ 07205

Garfield Park Academy Addition
Addition
Post-Bid
Willingboro, NJ 08046

Welding Shop Renovation to the Sussex County Technical School Project
Renovation
Results
Sparta, NJ 07871

ACIT South Wing Site Improvements
Renovation
Results
Mays Landing, NJ 08330

Fair Lawn Board of Education/ Contract 167-Additions at Thomas Jefferson Middle School
Addition
Construction
$9,970,000 est. value
Fair Lawn, NJ

Office Renovations at Thomas Jefferson Middle School
Construction
Fair Lawn, NJ 07410

AC High School Distance Learning Lab Renovations
Renovation
Bidding
Atlantic City, NJ

Shore Regional High School Restroom Renovation
Renovation
Post-Bid
West Long Branch, NJ 07764

Building Additions and Interior Renovations to Columbus, Franklin, Roosevelt and Washington Schools
Renovation, Addition - 27,009 SF
Results
Less than $12,500,000 est. value
Lyndhurst, NJ 07071

Last Updated 12/01/2021 03:35 AM
Project Title

GCHS Main Entry Alterations

Physical Address View project details and contacts
City, State (County) Gloucester City, NJ 08030   (Camden County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $262,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to, replacing existing interior store front with a Level III bullet resistant store front system. The Work shall include, but not be limited to, demolition, metal stud and drywall, store front and doors, hardware, painting, and all associated fire suppression, HVAC and electrical work.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents