Similar Projects
Walnut Street /Chestnut Street /Central Street Oval Improvements - City of Nashua
Infrastructure
Conception
$501,422 est. value
Nashua, NH

Main Dunstable Road/Buckmeadow Road Improvements - City of Nashua
Infrastructure, Alteration
Conception
$800,000 est. value
Nashua, NH 03062

Thomas More College of Liberal Arts Campus Improvements
Renovation
Design
Merrimack, NH 03054

Merrimack 43759
Renovation
Bidding
$1,063,878 est. value
Merrimack, NH

2021 Municipal Road Reconstruction
Infrastructure
Post-Bid
Milford, NH

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

2021 Paving Program - Arterial and Collector Roadway
Results
Nashua, NH

Prout Park Improvements
Results
Manchester, NH

East Hollis Street Improvements - Main Street to Court Street Corridor - City of Nashua
Alteration
Conception
$783,936 est. value
Nashua, NH 03060

Annual Street Reconstruction Program
Term Contract
Post-Bid
Manchester, NH

Rock Rimmon Park Improvements - Phase 2
Results
Manchester, NH

Nashua High School North Pavement Replacement - City Of Nashua
Infrastructure
Conception
$2,100,000 est. value
Nashua, NH 03063

Districtwide Paving Repairs / Crack Filling / Sealing / Lining Project
Infrastructure
Post-Bid
Goffstown, Manchester, NH 03045

2021 Paving Program-Residential Roadways
Results
Nashua, NH

Running Track Reconstruction
Renovation
Post-Bid
$300,000 est. value
Nashua, NH 03062

Last Updated 06/15/2022 12:10 PM
Project Title

Greeley Park Improvements - City of Nashua

Physical Address View project details and contacts
City, State (County) Nashua, NH 03064   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected February 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The infrastructure of Greeley Park is in need of attention, road paving is needed on the park roads, signage needs replacing, parking improvements are needed, fencing needs to be replaced, stage improvements are needed and repairs/improvements to the Stone House are required. The need to look at better lighting and security including additional cameras is very evident. This project is in included in the City of Nashua - Planning FY 2023 - 2028 Capital Improvement Plan (CIP). As of June 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Park/Playground, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents