Similar Projects
(1.017-Mile) Smart Overlay and Drainage on US 20 (Grant Hwy) from McHenry County Line to I-90 (Jane Addams Memorial Tollway)
Infrastructure
Bidding
Hampshire, IL

Weed Spray in Various locations in District 1
Infrastructure
Bidding

Naturalized Landscape Maintenance Services 2021-2023
Term Contract
Post-Bid
Montgomery, IL 60538

Edgelawn Bikeway Project Phase 3 Construction Engineering Services
Renovation
Post-Bid
Less than $408,000 est. value
Aurora, IL 60505

Traffic Signal Modernization and ADA Curb Ramp Improvements
Results
Elgin, IL

Smart Overlay, ADA Improvements and Milled Rumble Strips
Results
Aurora, IL 60502

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

(5.91-Mile) Smart Overlay Along US 14 From Hughes/Hartland Rd to Il 47 including the Installation of 2 Dry Wells at the Intersection of Hughes/ Hartland Road and US 14
Infrastructure
Bidding
Woodstock, IL

Expressway Mowing North
Post-Bid

Kirk Road And Dunham Road Intersection Improvements
Results
Saint Charles, IL 60175

Modifications at Eight Intersections in Algonquin, Huntley, Lake in the Hills, Lakewood, and Spring Grove
Infrastructure
Bidding
IL

Expressway Mowing North
Post-Bid

Prescribed Burn and Natural Area Maintenance Services
Term Contract
Results
Batavia, IL

Alden Township Resurfacing
Infrastructure
Bidding
Harvard, IL 60033

Last Updated 03/09/2022 05:55 PM
Project Title

2022 MFT Asphalt Patching

Physical Address View project details and contacts
City, State (County) Algonquin, IL (Kane, McHenry Counties)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is called Asphalt Patching and shall consist of bike path, roadway, parking lot, and driveway patching/resurfacing in various locations throughout the Village of Algonquin, McHenry and Kane County, Illinois. Bike Path and Roadway Resurfacing: This work will include 2" of HMA Surface Removal, 2" HMA Surface Course, preparation of base, topsoil, seeding, and erosion control blanket. Parking Lot and Driveway Resurfacing: This work will include 4" of HMA Surface Removal, 2" HMA Surface Course, 2" HMA Binder Course, and preparation of base.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents