Similar Projects
Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Morgan's Glen Phases 1 and 2 (Site Civil) and Phase 3 (Earthwork)
Post-Bid
Sarasota, FL

Palmetto Park Road from Southwest 7th Avenue to Southwest 5th Avenue
Results
Less than $4,950,000 est. value
FL

Resurfacing Group 17-18
Results
Less than $4,950,000 est. value
FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Construction Services for Poitras East Community Development District
Post-Bid
FL

Portland Cement and General Contractor
Results
Less than $14,102,991 est. value
FL

Thompson Valley Road Resurfacing Project
Results
Less than $1,100,000 est. value
Monticello, FL

NE 2nd Way Roadway Improvements
Results
Trenton, FL 32693

Smith Creek Road Widening and Resurfacing Project
Results
Crawfordville, FL 32327

FDOT SCOP 2019 Carter Rd./NE 1st St. Roadway Improvements
Results
Less than $450,000 est. value
Lawtey, FL

Silver Springs Acres Road Grading
Term Contract
Results
Less than $38,000 est. value
FL

CR 236 Widening and Resurfacing
Results
Less than $693,313 est. value
FL

Bayou Drive Shoulder Repair
Results
FL

NW 32nd Ave Resurfacing
Results
Less than $900,000 est. value
FL

Last Updated 11/04/2020 07:07 AM
Project Title

Asset Maintenance State Highways and all Associated Facilities in Bradford County

Physical Address View project details and contacts
City, State (County) FL   (Bradford County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,062,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Asset Maintenance State highways and all associated facilities in Bradford County including pits, sub-yards, and miscellaneous properties identified in section 4.7 of the Scope of Services. Section 0999- 16- Partnering, Do Not Bid Ls 1.000 e999- 10- 11 Asset Maintenance: Lump Sum Contract Ls 1.000 e999- 30- Asset Maintenance: Traffic Operations - Do Not Bid Ls 1.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 22 - Plumbing, Facility Storm Drainage, Sump Pumps, Sump-Pump Basins and Pits.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Railway Signaling and Control Equipment, Yard Management Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents