Similar Projects
Redevelopment of Seneca Foods Canning Facility - Olmsted County
Demolition, New Construction, Infrastructure
Conception
$7,800,000 CJ est. value
Rochester, MN 55902

City Walk Apartments
New Construction, Infrastructure - 98,398 SF
Design
$50,000,000 CJ est. value
Rochester, MN 55902

Destination Medical Center - All Other Phases
New Construction, Infrastructure
Design
$5,600,000,000 CJ est. value
Rochester, MN 55905

2023 Capital Improvement Plan Project, South
Infrastructure
Bidding
$500,000 CJ est. value
Stewartville, MN 55976

2023 Capital Improvement Plan Project - North
Infrastructure
Bidding
$500,000 CJ est. value
Stewartville, MN 55976

Marion Rest Area Drainfield Replacement
Infrastructure
Post-Bid
$476,000 est. value
Eyota, MN

Ditch 53-62 Main Trunk Repair
Infrastructure
Post-Bid

Site Construction and Control Building
New Construction, Infrastructure
Results
Rochester, MN

2021 Manor Brook Drive Northwest Drainage Improvements
Infrastructure
Results
Rochester, MN 55901

41st Street Apartment Building
New Construction, Infrastructure
Pending Verification
$52,100,000 CJ est. value
Rochester, MN 55901

3rd St. NW Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Rochester, MN 55901

Hart Farm South Phase 8
New Construction, Infrastructure
Design
$7,400,000 CJ est. value
Rochester, MN 55902

RFQ D/B - Material Recovery Facility Design and/or Build Services
Infrastructure
Post-Bid
$600,000 CJ est. value
Rochester, MN 55906

Eyota Highway Shop Trench Drain Repairs
Alteration
Results
Eyota, Rochester, MN 55934

West Circle Storage
New Construction, Infrastructure - 53,390 SF
Pending Verification
$5,800,000 CJ est. value
Rochester, MN 55901

Last Updated 12/08/2022 07:04 PM
Project Title

2022 Stabilization Project - Cascade Creek Tributary Channel (Lourdes Channel)

Physical Address View project details and contacts
City, State (County) Rochester, MN 55901   (Olmsted County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $541,437 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of December 8, 2022, this project has not yet been awarded. The project is expected to be awarded on January 4, 2022** Construction of the following de- scribed local improvement, pursuant to Minnesota Statutes, Chapter 429, as amended, in accordance with the plans and specifications for the same which are on file in the Office of the City Clerk of said City: J6710 2022 Stabilization Project: Cascade Creek Tributary channel (Lourdes channel) stabilization from 15 St NW to pedestrian bridge at 7 St NW (Douglas Trail) Bidders are responsible for all present and future downloads, including addendums and their attachments. CITY PROJECT NO. J6710

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents