Similar Projects
Building Renovations and Sanitary Sewer Upgrades at Seasonal Housing Facility
Renovation, Alteration - 12,000 SF
Design
Nantucket, MA

Cuttyhunk Island Wellfield Replacement
Infrastructure
Bidding
$350,000 est. value
Gosnold, MA

Assabet Well No 3 Connection - General Bids
Infrastructure
Bidding
$950,000 est. value
Acton, MA

Well No. 3 Upgrades - General Bids
Post-Bid
Less than $750,000 est. value
Littleton, MA

Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

Heather Row Grinder Pump (Furnish and Install)
Results
$225,000 est. value
Tewksbury, MA

GP 1 Replacement Well Implementation - General Bids
Results
$350,000 est. value
Seekonk, MA

Installation of an Automatic Pumping System
Infrastructure
Bidding
$70,000 est. value
Lynn, MA 01904

Dewatering Pump Restoration and Maintenance Service, Diesel Powered
Post-Bid
Charlestown, MA

Decommissioning of a Former Water Well
Results
$15,000 to $25,000 est. value
Huntington, MA

Well Station 4 Improvements
Infrastructure
Bidding
Oak Bluffs, MA

Well Cleaning 2 and 8 Redevelopment
Post-Bid
Sudbury, MA

Construction of Two Gravel-Packed Wells for Municipal Water Supply, and Decommissioning of Four Municipal Wells
Results
$475,000 est. value
South Dartmouth, MA 02748

Well Station 4 Booster Pump System
Infrastructure
Bidding
Sharon, MA 02067

Municipal Drinking Water Well Cleaning and Rehabilitation
Term Contract
Post-Bid
Less than $200,000 est. value
Canton, MA

Last Updated 12/08/2021 05:04 PM
Project Title

Water Treatment Plant Pump Replacement

Physical Address View project details and contacts
City, State (County) Orleans, MA 02653   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $130,000
Plans Available from Copy Center - 08/18/21
Owner View project details and contacts
Architect View project details and contacts
Description

WTP Pump Replacement Project. The work shall consist of furnishing all labor, materials, tools, equipment, and incidentals required for the completion of the Project. These improvements include, but are not limited to mechanical process and electrical improvements to the existing Water Treatment Plant pumps. The project shall include furnishing all plant, labor, services, equipment, materials, devices, facilities, and appurtenances for the demolition, removal, and disposal of select existing materials, equipment, and facilities, and the installation of new or (as noted) refurbished materials, equipment, and facilities. Replacement activities identified in the contract scope of work indicate the demolition, removal, and disposal of existing, followed by furnishing and installation of new or refurbished. A general description of the work to be performed under this contract shall include, but will not be limited to, the construction operations described below: 1. Proposed improvement work will be performed on the following WTP pumps: a. Raw Water Pump #1 b. Raw Water Pump #2 c. Finished Water Pump #2 .

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents