Similar Projects
Touchless Plumbing Fixtures (Various Locations)
Alteration
Bidding
Sanford, FL

Plumbing Services
Term Contract, Alteration
Bidding
Tampa, FL 33607

Plumbing Repairs
Post-Bid
Ocala, FL

Plumbing Upgrades: 13931 7th Street
Post-Bid
Dade City, FL 33525

Plumbing Repair Services
Term Contract
Results
Fort Walton Beach, FL

Plumbing Contractor Services
Term Contract
Results
FL

Marco Canal Culvert Headwall Replacement And Embankment Stabalization Project
Infrastructure
Bidding
Miami Gardens, FL

Plumbing Services
Post-Bid
Alachua, Gainesville, Micanopy, FL 32641

Plumbing Repairs and Services and Parts
Term Contract
Results
Less than $25,000 est. value
Brooksville, FL 34601

SWAG 10th Street Stormwater Improvements, PH. 2A
Renovation, Infrastructure
Bidding
$470,000 est. value
Key Colony Beach, FL 33051

Plumbing Contractor Services
Term Contract
Post-Bid
West Palm Beach, FL

Plumbing Contractor Services
Term Contract
Results
Kissimmee, FL 34744

Plumbing Contractor Services
Alteration
Bidding
FL

Pensacola Beach Quiet Water Bath House Plumbing Repairs
Post-Bid
FL

Water Bottle Filling Stations
Results
FL

Last Updated 04/14/2022 12:49 PM
Project Title

Sources Sought - GSA, Region 4, Tampa, Design-Build Closed Loop Side Stream Filtration System, Water Source ACS and Piping Replacement

Physical Address View project details and contacts
City, State (County) Tampa, FL   (Hillsborough County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will design and install a new side stream water filtration system for the entire closed loop cooling system which was recently converted from an open loop condenser water system. Facility is seventeen floors with a basement. The closed loop cooling system provides cooling to all computer room units, elevator machine rooms, transformer rooms and others ancillary spaces through a plate and frame heat exchanger which is connected to the condenser water system. Due to years of inadequate chemical treatment, the piping and air conditioning units serving the basement are clogged and in need of replacement.

Details

Division 22 - Plumbing, Common Work Results for Plumbing, Expansion Fittings and Loops for Plumbing Piping, Domestic Water Filtration Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents