Similar Projects
Trinity Storm Water Park Phase II
Bidding
$8,221,000 to $11,714,000 est. value
Evansville, IN

2021 Street and Sewer Materials
Bidding
South Bend, IN

Collection System Improvements
Post-Bid
New Palestine, IN 46163

Jeffersonville CSO Storage Interceptor Phase 3
Post-Bid
Jeffersonville, IN

Madison Street and 65th Lane Sanitary Sewer Improvement
Results
Merrillville, IN 46410

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

Marion Sewer CIPP- City Wide Sewer Lining
Bidding
Marion, IN

Hessen Cassel Storm and Sidewalk Improvements
Post-Bid
Fort Wayne, IN 46800

Sanitary Sewer Extension at the Shelbyville AASF/Readiness Center
Results
Shelbyville, IN 46176

Sewer Construction Material
Term Contract
Post-Bid
Fort Wayne, IN

I-69 / SR 64 South East Quadrant Sanitary Sewer - Phase 1
Results
$470,000 to $530,000 est. value
Princeton, IN 47670

Cass Street Bottleneck Removal
Post-Bid
Peru, IN

2020 Sanitary Sewer Extensions-Contract B
Results
Decatur, IN 46733

Underground Facility Locating Services
Term Contract
Post-Bid
Anderson, IN 46011

2020 Sanitary Sewer Extensions-Contract C
Results
Decatur, IN 46733

Last Updated 09/22/2020 04:27 PM
Project Title

LTCP Phase 5 - South Region CSO Abatement

Physical Address View project details and contacts
City, State (County) Noblesville, IN 46060   (Hamilton County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction poured-in-place diversion structure that will convey combined sewer flows to the WWTP and proposed outfall. Construct PVC relief sewer (36IN) from existing Central Storage Facility at teh WWTP to diversion structure. Construct an RCP combined sewer (24IN) overflow from a proposed outfall discharging to the White River to the diversion structure. Install an electrical actuated slide gate with control system integration to plant SCADA. Pipe bursting of existing 12IN combined sewer. CIPP lining of existing 38.5 IN x 24 IN egg shaped, brick storm sewer along Chestnut street. Construct RCP storm sewers on 4th, 14th, 16th and Gerald Streets with pipe sizes ranging between 12 IN and 24 IN.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents